chore(consistency): sync task status from DB [auto]

Updated by fix-consistency on 2026-06-27:
  - ACTIVITY-WP-0010-T03: progress → wait
This commit is contained in:
2026-06-27 08:07:42 +02:00
parent ec66e06066
commit 6c8cb1b7b6

View File

@@ -8,7 +8,7 @@ status: blocked
owner: codex
topic_slug: custodian
created: "2026-06-18"
updated: "2026-06-19"
updated: "2026-06-27"
state_hub_workstream_id: "f2c73ac6-13f0-4005-82cc-76c7c9f9c8b9"
---
@@ -87,7 +87,7 @@ reported 9 passed.
```task
id: ACTIVITY-WP-0010-T02
status: wait
status: done
priority: high
state_hub_task_id: "23545ddc-926b-485a-8535-5cc11e01134a"
```
@@ -121,6 +121,16 @@ Hub handoff message `9a074b7c-4b87-4e3c-a6bf-e1fe5580daa8` asks
- `actcore-state-hub-bridge` remains `0/1` Ready with upstream timeouts, so T02
is not fully closed until the node-local State Hub tunnel is restored.
2026-06-27 recheck:
- Superseded by real scheduled runner evidence: State Hub daily_triage events on
2026-06-24, 2026-06-25, 2026-06-26, and 2026-06-27 all reached State Hub and
wrote working-memory notes. The bridge/sink is therefore reachable for the
live runner.
- 2026-06-24 and 2026-06-25 were schema-valid; 2026-06-26 and 2026-06-27 failed
output validation after calling llm-connect. That moves the active blocker out
of T02 and into the WP-0016 live bundle/smoke lane. Marking T02 done.
## Run Daily Triage Fixture Smoke
```task
@@ -153,6 +163,16 @@ Done when:
- T03 therefore remains open until State Hub bridge reachability is restored and
a run emits non-secret `daily_triage` progress with `output_validated=true`.
2026-06-27 recheck:
- Scheduled runs on 2026-06-24 and 2026-06-25 satisfy the non-secret smoke
evidence for llm-connect call, State Hub progress with output_validated=true,
and working-memory note creation.
- Kept T03 at progress rather than done because the workstation did not run the
live verifier against Temporal/activity-core DB, and the smoke must be repeated
after the WP-0016 code/schema/runtime-prompt deployment due the 2026-06-26 and
2026-06-27 malformed-output failures.
## Collect Three Clean Scheduled Runs
```task
@@ -176,6 +196,14 @@ Done when:
- `ACTIVITY-WP-0006-T03` and `ACTIVITY-WP-0009-T01` can move from `wait` to
`done`.
2026-06-27 recheck:
- Three-clean-run streak is reset. The latest sequence is 2026-06-24 clean,
2026-06-25 clean, 2026-06-26 validation_failed, 2026-06-27 validation_failed.
- Current pickup is to deploy ACTIVITY-WP-0016 code/schema together with the
Railiance runtime prompt and max_tokens changes, run a live smoke, then restart
the three-consecutive-scheduled-run gate from zero.
## Close Handoff State
```task