Unblock lifecycle statuses after daily triage trust evidence closed
(06-28 through 07-03 clean scheduled runs). Finish WP-0010, return
WP-0008/0009/0015 to active with accurate wait reasons, and document
the scheduled-wait vs hard-blocker distinction.
Note the 2026-06-19 live reconciliation on railiance01: llm-connect
deployed, worker restarted with LLM_CONNECT_URL, fixture smoke passed.
Manual daily triage still blocked on actcore-state-hub-bridge reachability.