Updated by fix-consistency on 2026-06-27: - update .custodian-brief.md for activity-core
2.8 KiB
Custodian Brief — activity-core
Domain: infotech
Last synced: 2026-06-27 06:00 UTC
State Hub: http://127.0.0.1:8000 (adjust if running on a remote machine)
Active Workstreams
LLM Output Robustness & The Producer Trust Boundary
Progress: 3/10 done | workstream_id: 4ef0d53b-1777-41ae-80c6-1b69fdb34726
Open tasks:
- ! Reproduce & Root-Cause The Failure
74fd16a5(wait: Local analysis complete: mechanism is the unbounded ~1-per-workstream recommendation list (16 active workstreams; break at char 5268 ~rank 8-9); both first attempt and retry failed. Exact token + finish_reason are unrecoverable from activity-core (complete() drops finish_reason; report cap 4000 < 5268; log cap 2000). Remaining: pull llm-connect producer-side logs on railiance01 (cluster/operator-owned). Does NOT block T02/T03 — mitigation is identical regardless.) - ► Tests + calibration re-entry
b7b9e07a - ► Schema + Prompt Redesign For Error Locality
ae67ca8c - ► Tests + Calibration Re-Entry
c881500b - · Reproduce & root-cause the 06-26 validation failure
2d3bba00 - · Schema + prompt redesign for error locality
5da6962c - · Boundary parser — verify & mitigate with quarantine lane
4c408114
Post-triage operational hardening
Progress: 6/8 done | workstream_id: 5646e13a-13af-4724-bca6-3c0d86f96733
Open tasks:
- ! Three-Run Calibration Feedback
7cbf0a35 - · Implement reuse_surface_report_gaps shell resolver for coulomb registry hygiene
25293d5e
Adopt State Hub Beachhead Endpoint
Progress: 0/2 done | workstream_id: bbc07f9e-9323-4b2b-b556-c33b37d0b228
Open tasks:
- ! Point STATE_HUB_URL at the beachhead
76b6132d - ! Retire the bespoke actcore-state-hub-bridge proxy
526c2129
Daily Triage LLM Reconciliation And Evidence
Progress: 1/5 done | workstream_id: f2c73ac6-13f0-4005-82cc-76c7c9f9c8b9
Open tasks:
- ! Reconcile Live Railiance Runtime
23545ddc - ! Run Daily Triage Fixture Smoke
10e0df77 - ! Collect Three Clean Scheduled Runs
dc6b9482 - ! Close Handoff State
ecc57e21
Intent gap closure
Progress: 4/6 done | workstream_id: d64cfbba-6da7-4737-afb9-866afa0e9cda
Open tasks:
- ! Close Daily Triage Scheduled-Run Trust Gap
7012e4fd - ! Promote Issue-Core Task Emission Safely
3854677b
Weekly Coding Retrospection schedule (Saturday evenings)
Progress: 2/3 done | workstream_id: 7387fc50-1f2c-471a-9d85-bb085cbd0b63
Open tasks:
- ! Dry-run verify + enable + docs
9dcbebe7
MCP Orientation (when available)
If the state-hub MCP server is reachable, call:
get_domain_summary("infotech")
This provides richer cross-domain context.
If the MCP call fails, use this file as your orientation source.