Testing, Release, and Migration Spec
Test Layers
- unit tests for models, validators, and services
- API tests for route behavior and auth semantics
- contract tests from fixtures
- migration tests for Alembic revisions and imports
- consumer smokes for ops-hub and activity-core
- optional Playwright visual checks once UI exists
Release Gates
A Core Hub release cannot replace Inter-Hub until:
- public
/api/v2compatibility smokes pass; - protected route auth behavior is proven without exposing secrets;
- ops-hub bootstrap smoke passes;
- activity-core sink smoke passes or is explicitly deferred to State Hub fallback;
- data import row counts and relationship checks pass;
- rollback path is documented;
- production operator approves cutover.
Migration Gates
- Extract Inter-Hub schema and route inventory.
- Build fixture set from representative production-safe records.
- Import data into Core Hub staging.
- Compare row counts and key relationships.
- Run dual-read or shadow smokes.
- Switch traffic only after smoke evidence is recorded.
Haskell Retirement Gate
Do not retire production Inter-Hub or the haskelseed/Haskell build lane until Core Hub serves the required compatibility surface and production traffic has moved.