generated from coulomb/repo-seed
IB-WP-0016-T07: review report and output policy; close IB-WP-0016
Enrich reports/generation-summary.md with the review-oriented sections that the 2026-05-17 smoke run flagged as missing: ## Chapter coverage (per-chapter source/entity/relation/anchor counts), ## Entities (the deduped title list), ## Unmapped source chunks (sources with no downstream generated artifact), and ## Page anchors (total plus deterministic sample). Sections are conditional on data being present so generic non-Lefevre runs stay terse. Add docs/lefevre-readiness.md as the final sign-off document for IB-WP-0016: what is wired (T01-T06 recap), an output policy table (checked-in fixture sources vs disposable generated infospaces vs archive targets), a seven-item reviewer checklist (duplicate entities, relation endpoints, weak evidence, overgeneralization, anchor coverage, unmapped sources, plan-vs-actual variance), a scale-up plan from one-chapter to full-book, and the load-bearing risks still outstanding (cross-chunk dedup, whole-run resume, adaptive routing deferred to LLM-WP-0004 / IB-WP-0018, rate-table drift). Closes IB-WP-0016 (Lefevre EPUB3 Infospace Readiness Pilot): T01-T07 all done; the workplan is set to status=done. 131 tests pass, 1 skipped (live OpenRouter smoke, correctly gated). Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
This commit is contained in:
@@ -4,7 +4,7 @@ type: workplan
|
||||
title: "Lefevre EPUB3 Infospace Readiness Pilot"
|
||||
domain: markitect
|
||||
repo: infospace-bench
|
||||
status: active
|
||||
status: done
|
||||
owner: markitect
|
||||
topic_slug: markitect
|
||||
created: "2026-05-14"
|
||||
@@ -209,7 +209,7 @@ state_hub_task_id: "c6bf97c3-1c2c-4993-8f4f-97a48e01cce2"
|
||||
|
||||
```task
|
||||
id: IB-WP-0016-T07
|
||||
status: todo
|
||||
status: done
|
||||
priority: medium
|
||||
state_hub_task_id: "5ff1f11e-49ad-4c2d-bd4c-b8cc261309bc"
|
||||
```
|
||||
|
||||
Reference in New Issue
Block a user