Files
infospace-bench/docs
tegwick 13f9c1895c IB-WP-0016-T03: scale-aware planning
Replace generate plan's full-prompt dump with a compact summary that
reports selected-chunk counts, selected chapter numbers, per-workflow
call counts, prompt-word and token estimates, and a rough USD cost when
--cost-per-1k is supplied. Selection filters --chapter (label or number,
repeatable), --from-chapter / --to-chapter (numeric range), and --chunk
(repeatable id) shape the estimate. Budget caps --max-calls and
--cost-cap are reported as exceeds_* booleans so callers can fail fast
before run.

The old full per-workflow plan with prompts remains available behind
--full so deep inspection is opt-in instead of the default.

Whole-Lefevre estimate at default max_words=800: 146 chunks, 730 calls,
~518k prompt tokens, ~$155 at $0.30/1k. Chapters 3-5 only: 19 chunks,
95 calls, ~64k tokens. 87 tests pass.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-05-17 18:18:09 +02:00
..
2026-05-14 16:26:42 +02:00
2026-05-14 13:47:36 +02:00