generated from coulomb/repo-seed
2.1 KiB
2.1 KiB
id, type, title, domain, repo, status, owner, topic_slug, created, updated, state_hub_workstream_slug, state_hub_workstream_id
| id | type | title | domain | repo | status | owner | topic_slug | created | updated | state_hub_workstream_slug | state_hub_workstream_id |
|---|---|---|---|---|---|---|---|---|---|---|---|
| IB-WP-0011 | workplan | Pruned Legacy Reference Pilot | markitect | infospace-bench | completed | markitect | markitect | 2026-05-14 | 2026-05-14 | ib-wp-0011-pruned-legacy-reference-pilot | 5bcc4fe2-a1d3-4edf-9e6e-0b2844b5b499 |
IB-WP-0011 — Pruned Legacy Reference Pilot
Goal
Migrate a small representative slice of
markitect-main/examples/infospace-with-history into infospace-bench to prove
successor behavior against real legacy content.
Tasks
T01 — Select representative slice
id: IB-WP-0011-T01
status: done
priority: high
state_hub_task_id: "49d4865b-38b0-4994-a0f9-1cbdf718689c"
- Choose one or two source chapters or a compact equivalent fixture
- Include at least one entity, one relation, one evaluation, and one metrics snapshot
- Avoid committing generated bulk
T02 — Migrate schemas/contracts and methodology
id: IB-WP-0011-T02
status: done
priority: high
state_hub_task_id: "3bea0589-cd48-4a12-b2c5-e8996d383195"
- Convert relevant legacy schemas into
markitect-toolcontracts or supported validation artifacts - Preserve metrics methodology where still applicable
- Document changes from the old experiment
T03 — Run successor pipeline
id: IB-WP-0011-T03
status: done
priority: high
state_hub_task_id: "fe012682-7af3-42a0-8d14-07685a663242"
- Load, validate, inspect, evaluate, and report on the migrated pilot
- Compare outputs against expected legacy behavior
- Capture gaps as follow-up tasks
T04 — Publish migration report
id: IB-WP-0011-T04
status: done
priority: medium
state_hub_task_id: "5a6c885f-6acb-4d18-9aff-f710423e0198"
- Add a report under the pilot's
reports/ - Include what was replaced, what was delegated, and what remains missing
- Use the report as evidence for replacement readiness
Acceptance
- A legacy-derived pilot exists under
infospaces/ - It exercises parser, validation, entity/relation, evaluation, metrics, and graph features
- Its migration report is explicit about parity and gaps