Commit Graph

4 Commits

Author SHA1 Message Date
b5d73aa18b feat(WP-0009): IHF GAAF Compliance Foundation — type registries, extension manifests, architectural contracts
Some checks failed
Test / test (push) Has been cancelled
Implements IHUB-WP-0009: closes four GAAF-2026 gaps before domain hub work begins.
- TypeRegistry helper + controllers/views (hub_kind, hub_capability_manifest)
- HubCapabilityManifest entity with validation and registry linkage
- ARCHITECTURE-LAYERS.md + CI-enforced boundary contracts
- Alembic migration 1743724800, fitness tests (Test/Architecture/)
- GAAF spec, Operational Architecture spec, domain hub extension guide
- Updates to CLAUDE.md, SCOPE.md, Schema.sql, Routes, FrontController, Types

state_hub_sync: pending (tunnel was STALE at completion time; run fix-consistency)

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-31 21:17:39 +00:00
1862bb295a chore: register Phase 5 workplan (IHUB-WP-0005)
Some checks failed
Test / test (push) Has been cancelled
Registers Phase 5 (Agent-Assisted Distillation) workplan with 9 tasks
(T01–T09) covering schema, AgentProposalsController, Claude API
integration, and agent audit dashboard. Updates CLAUDE.md to point to
the Phase 5 workplan and adds IHP_ANTHROPIC_API_KEY to the required
env vars table.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-29 14:17:59 +00:00
bc57852473 chore: update CLAUDE.md active workplan to Phase 4
Some checks failed
Test / test (push) Has been cancelled
Points active workplan to IHUB-WP-0004 and updates current state
description to reflect Phases 1–3 complete.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-29 10:59:16 +00:00
8b6ce5bbc8 docs: add specification, reference docs, workplan, and agent guidance
Adds all Phase 0 content that was created but never committed:
- CLAUDE.md and SCOPE.md — agent and developer orientation
- specs/TailwindForInteractionHubs_v0.2.md — IHF Tailwind coding guide
- docs/ — five IHP v1.5 reference guides (overview, data, controllers, realtime, ihf-mapping)
- workplans/IHUB-WP-0001 — Phase 1 implementation plan (12 tasks, state-hub synced)

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-27 02:07:13 +01:00