Commit Graph

5 Commits

Author SHA1 Message Date
3b2edd4a9e feat: scheduled agent execution via activity-core (WP-0006, v1.3.0)
Enable kaizen agents to run on a regular cadence against a preselected repo
roster, orchestrated by activity-core and prepared by kaizen-agentic — without
this repo owning cron, Temporal workers, or an LLM runtime.

CLI + module:
- src/kaizen_agentic/schedule.py — .kaizen/schedule.yml parse/validate/scaffold
- `kaizen-agentic schedule` group: init, validate, list, prepare <agent>
  (prepare bundles agent prompt + memory + metrics + repo pointers, offline)
- tests/test_schedule_cli.py — 15 tests

Contract & design:
- ADR-005 scheduled agent execution; schema doc + example manifest
- discover_kaizen_scheduled_repos resolver spec, state-hub roster fields,
  kaizen.schedule.prepared event payload, activity-core handoff checklist
- INTEGRATION_PATTERNS Pattern 2 extended with roster model

ActivityDefinition drafts (enabled: false):
- weekly-coach-orientation, weekly-optimization-review

Docs: agency-framework, CLI cheat sheet, PACKAGE_RELEASE runner prereqs,
EcosystemIntegration, CHANGELOG, TODO. Workplan closed (status: done).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-17 08:19:51 +02:00
b48a2102d7 WP-0004: ecosystem integration complete
Add Helix Forge correlation (HELIX_SESSION_UID env, metrics correlate),
artifact-store publish (metrics publish), activity-core ActivityDefinition
references, integration patterns docs, and canon/knowledge design artifacts.
2026-06-16 01:53:01 +02:00
fd2edfbe6c WP-0003 Part 5: tdd-workflow metrics pilot
Add metrics frontmatter and session-close recording to tdd-workflow,
document the reference implementation in wiki/AboutKaizenAgents.md,
and add an e2e test covering record → show → optimize → brief.
2026-06-16 01:48:43 +02:00
bd74d7d122 Document measurement loop plan and ecosystem integration strategy.
Persist INTENT and ecosystem assessments in history/, add ADR-004 for
project metrics with Helix Forge correlation, and register WP-0003 and
WP-0004 workplans with State Hub. Update SCOPE, README, and agency-framework
docs to reflect the two-layer measurement model.
2026-06-16 01:34:13 +02:00
71ef5f4734 Added project documentation in wiki and established INTENT.md 2026-06-16 00:58:43 +02:00