diff --git a/roadmap/infospace-s3-closeout/PLAN.md b/roadmap/infospace-s3-closeout/PLAN.md index 397badbe..29fe7ffe 100644 --- a/roadmap/infospace-s3-closeout/PLAN.md +++ b/roadmap/infospace-s3-closeout/PLAN.md @@ -10,6 +10,14 @@ and formally closes the roadmap. **Parent roadmap:** `roadmap/infospace-tooling/PLAN.md` **Example location:** `examples/infospace-with-history/` +**Status: CLOSED (2026-04-22).** All acceptance criteria except the cosmetic +per-chapter history (C.7) are met. Final metrics: 988 entities, 988 evaluations, +6/6 viability thresholds PASS (`per_entity_mean = 3.957`). Tooling work that +came out of this close-out landed as commits `c0615c2d` (gemini retry, +unified skip-existing, non-destructive metrics I/O) and `d44a4cd3` +(`infospace entity` lookup, `evaluate --model-fallback`, `llm-check` +stale-key advisory, `build_state` type guard). + ### State at workstream open (2026-02-26) | Item | Status | @@ -22,6 +30,28 @@ and formally closes the roadmap. | 3 missing evaluations | ⏳ Outstanding | | 4 follow-up items (commit b055c8d7) | ⏳ Outstanding | +### State at workstream close (2026-04-22) + +| Task | Status | +|------|--------| +| C.1 Complete 3 missing entity evaluations | ✅ Done (commit f325f89d) | +| C.2 Run eval-summary and verify viability | ✅ Done — 6/6 PASS | +| C.3 Refresh metrics report (988 entities) | ✅ Done — snapshot `090bb961` | +| C.4 Document advanced usage patterns | ✅ Done — `examples/infospace-with-history/docs/advanced-usage.md` | +| C.5 Composition-examples documentation | ✅ Done — `docs/composition-guide.md` | +| C.6 Performance benchmarking note | ✅ Done — `examples/infospace-with-history/docs/performance-notes.md` | +| C.7 Clean per-chapter git history | ⏭️ Deferred indefinitely — see note below | +| C.8 Formally close S3 roadmap | ✅ This commit | + +**C.7 disposition.** The task assumed a pre-existing `clean-example-history` +branch with chapters 1–8 already committed; that branch no longer exists in +the repo. The task is explicitly cosmetic ("does not change output files"), +and the output files themselves are canonical. Reconstructing a 35-commit +per-chapter history from scratch would be archaeological rather than useful. +Closing as "won't do" unless a specific archival need surfaces. If revisited, +entities can be grouped by their `## Source Chapter` markdown section to +reconstruct chapter membership. + --- ## Tasks diff --git a/roadmap/infospace-tooling/PLAN.md b/roadmap/infospace-tooling/PLAN.md index 5253736a..edd96b50 100644 --- a/roadmap/infospace-tooling/PLAN.md +++ b/roadmap/infospace-tooling/PLAN.md @@ -1,5 +1,31 @@ # Viable Infospace Tooling — Roadmap +## Status: CLOSED (2026-04-22) + +All three stages complete. + +| Stage | Status | Notes | +|-------|--------|-------| +| Stage 1 — Platform additions (S1.1–S1.7) | ✅ Done | Entity parser, schema validator, embeddings, graph analysis, eval I/O, batch orchestrator, FCA | +| Stage 2 — Infospace tooling (S2.1–S2.7) | ✅ Done | Config model, lifecycle CLI, per-entity eval, collection checks, history, composition, docs | +| Stage 3 — Example revision (S3.1–S3.5) | ✅ Done (except cosmetic S3.2) | See `roadmap/infospace-s3-closeout/PLAN.md` | + +**Final validation (Wealth of Nations / VSM example, 988 entities):** +- 988 per-entity evaluations landed +- Collection checks pass 6/6 viability thresholds (`per_entity_mean = 3.957` + against threshold 3.5; `redundancy_ratio = 0.006`; `coverage_ratio = 0.619`; + `coherence_components = 0`; `consistency_cycles = 0`; + `granularity_entropy = 2.675`) +- Composition demonstrated via `examples/supply-chain-vsm/` +- S3.2 (clean per-chapter git history) deferred as cosmetic-only; rationale + in the close-out plan + +See `roadmap/infospace-s3-closeout/PLAN.md` for the final task-level +disposition and `examples/infospace-with-history/` for the canonical +validated example. + +--- + ## Vision An **infospace** is a structured, evaluable, composable collection of