Commit Graph

2 Commits

Author SHA1 Message Date
9e8d73fa7d docs(roadmap): close out infospace tooling S3 and parent roadmap
All three stages of the infospace tooling roadmap are complete. The Wealth
of Nations / VSM example passes 6/6 viability thresholds on 988 entities,
and composition is demonstrated via the supply-chain-vsm example.

- Parent roadmap (roadmap/infospace-tooling/PLAN.md): header now shows the
  closed status with final validation metrics.
- S3 close-out plan (roadmap/infospace-s3-closeout/PLAN.md): records the
  final task dispositions. C.1–C.6 and C.8 done; C.7 (clean per-chapter
  git history) is deferred indefinitely — the task was cosmetic, its
  prerequisite branch no longer exists, and reconstructing 35 archival
  commits would not change any output files. Rationale documented inline.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-04-22 07:08:43 +02:00
4ce856d4d0 docs: metrics methodology, collection-level tasks, and infospace tooling roadmap
Add METRICS-METHODOLOGY.md documenting the theoretical frameworks
(SEQUAL, OntoClean, OOPS!, OntoQA, FCA, DSL principles) adapted for
two-layer evaluation (LLM-Eval + deterministic aggregation) across
five collection concerns: redundancy, coverage, coherence, consistency,
and granularity balance.

Extend INFRA-TASKS.md with assignment assessment (tasks 4-7),
per-concept metrics (tasks 8-12), and collection-level metrics
(tasks 13-19).

Add roadmap/infospace-tooling/PLAN.md defining terminology (infospace,
topic, discipline, entity, evaluation, viability) and a three-stage
implementation plan: Stage 1 platform additions, Stage 2 infospace
tooling layer, Stage 3 example revision.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-18 23:53:21 +01:00