# Infospace Tooling — Stage 3 Close-out ## Context Stages 1 and 2 of the infospace tooling roadmap are complete. Stage 3 used the Wealth of Nations / VSM example to validate the tooling end-to-end. Most of S3 is done; this workstream finishes the remaining tasks, addresses deferred cleanup, and formally closes the roadmap. **Parent roadmap:** `roadmap/infospace-tooling/PLAN.md` **Example location:** `examples/infospace-with-history/` **Status: CLOSED (2026-04-22).** All acceptance criteria except the cosmetic per-chapter history (C.7) are met. Final metrics: 988 entities, 988 evaluations, 6/6 viability thresholds PASS (`per_entity_mean = 3.957`). Tooling work that came out of this close-out landed as commits `c0615c2d` (gemini retry, unified skip-existing, non-destructive metrics I/O) and `d44a4cd3` (`infospace entity` lookup, `evaluate --model-fallback`, `llm-check` stale-key advisory, `build_state` type guard). ### State at workstream open (2026-02-26) | Item | Status | |------|--------| | S3.1 Migrate example to infospace config | ✅ Done | | S3.3 Per-entity eval batch | ✅ 985/988 complete; metrics.yaml updated | | S3.4 Tutorial rewrite | ✅ Done | | S3.5 Supply-chain-vsm composition demo | ✅ Done | | S3.2 Clean per-chapter git history | ⏳ Deferred — included here | | 3 missing evaluations | ⏳ Outstanding | | 4 follow-up items (commit b055c8d7) | ⏳ Outstanding | ### State at workstream close (2026-04-22) | Task | Status | |------|--------| | C.1 Complete 3 missing entity evaluations | ✅ Done (commit f325f89d) | | C.2 Run eval-summary and verify viability | ✅ Done — 6/6 PASS | | C.3 Refresh metrics report (988 entities) | ✅ Done — snapshot `090bb961` | | C.4 Document advanced usage patterns | ✅ Done — `examples/infospace-with-history/docs/advanced-usage.md` | | C.5 Composition-examples documentation | ✅ Done — `docs/composition-guide.md` | | C.6 Performance benchmarking note | ✅ Done — `examples/infospace-with-history/docs/performance-notes.md` | | C.7 Clean per-chapter git history | ⏭️ Deferred indefinitely — see note below | | C.8 Formally close S3 roadmap | ✅ This commit | **C.7 disposition.** The task assumed a pre-existing `clean-example-history` branch with chapters 1–8 already committed; that branch no longer exists in the repo. The task is explicitly cosmetic ("does not change output files"), and the output files themselves are canonical. Reconstructing a 35-commit per-chapter history from scratch would be archaeological rather than useful. Closing as "won't do" unless a specific archival need surfaces. If revisited, entities can be grouped by their `## Source Chapter` markdown section to reconstruct chapter membership. --- ## Tasks ### C.1 — Complete the 3 missing entity evaluations 985 of 988 entities have evaluation files. Identify and evaluate the remaining 3. ```bash cd examples/infospace-with-history # Identify missing slugs comm -23 \ <(ls output/entities/*.md | xargs -I{} basename {} .md | sort) \ <(ls output/evaluations/*.md | xargs -I{} basename {} .md | sort) # Evaluate each missing entity individually markitect infospace evaluate --entity --provider openrouter ``` **Acceptance:** `ls output/evaluations/*.md | wc -l` returns 988. --- ### C.2 — Run eval-summary and verify viability Run the aggregation command to update per_entity_mean from all 988 evaluations, then check all 6 viability gates pass. ```bash cd examples/infospace-with-history unset OPENROUTER_API_KEY # stale env var guard markitect infospace eval-summary --update-metrics markitect infospace viability ``` Current sample reading (985 entities): `per_entity_mean = 3.956` against threshold 3.5. Expected: all 6 metrics pass. **Acceptance:** `markitect infospace viability` exits 0 and shows 6/6 PASS. --- ### C.3 — Refresh the metrics report The metrics report was generated from chapters 1–4 only. Regenerate it from the full 988-entity set. ```bash cd examples/infospace-with-history markitect infospace check --provider openrouter # or reuse existing check outputs markitect infospace history # confirm snapshot recorded ``` **Acceptance:** `output/metrics/metrics.yaml` reflects all 988 entities; a dated snapshot exists in the metrics history. --- ### C.4 — Document advanced usage patterns Write `examples/infospace-with-history/docs/advanced-usage.md` covering: - Incremental evaluation (adding entities after initial run, skip-if-exists behaviour) - Re-evaluating after guideline changes (`--force` flag) - Interpreting per-entity score distributions and identifying outliers - Using `markitect infospace entities --sort-by score` to triage low scorers - Reading and acting on collection check outputs (redundancy pairs, coverage gaps) **Acceptance:** File exists with ≥ 4 documented patterns, each with a worked command example. --- ### C.5 — Add composition examples to documentation Document how the supply-chain-vsm example (`examples/supply-chain-vsm/`) demonstrates composition. Add a `docs/composition-guide.md` covering: - What composition means (discipline binding) - How supply-chain-vsm binds WoN as a discipline - How to create a new infospace that uses an existing one as a discipline - Viability requirement: the discipline must pass its own thresholds before binding Reference `examples/supply-chain-vsm/` throughout. **Acceptance:** `docs/composition-guide.md` exists and links to supply-chain-vsm. --- ### C.6 — Performance benchmarking note Rather than a full benchmarking guide (out of scope for a 988-entity example), record observed timings in a `docs/performance-notes.md`: - Eval batch duration (~4 hrs for 988 entities via OpenRouter) - Tokens per entity (rough estimate from usage logs) - Embedding cache hit rate after first run - Recommendation: provider choice (OpenRouter vs Gemini) for different dataset sizes **Acceptance:** File exists with at least 4 concrete measurements or estimates. --- ### C.7 — S3.2: Clean per-chapter git history (deferred cleanup) Create a clean branch where each of the 35 processed chapters has its own commit. Chapters 1–8 are already done on branch `clean-example-history`; 27 remain. This is a cosmetic/archival task — it does not change output files. ```bash git checkout clean-example-history # For each remaining chapter (9–35): # cherry-pick or re-commit the chapter output files with a per-chapter message git log --oneline clean-example-history # verify 35 chapter commits ``` **Acceptance:** Branch `clean-example-history` has exactly 35 chapter commits (one per chapter), rebased onto current main. **Note:** This task can be done independently of C.1–C.6. Low urgency — do last. --- ### C.8 — Formally close the S3 roadmap Update `roadmap/infospace-tooling/PLAN.md` to mark all S3 tasks as complete. Add a close-out summary at the top of the file with final metrics and date. Commit with a `docs(roadmap)` message. **Acceptance:** PLAN.md header shows all stages complete; committed to main. --- ## Task order ``` C.1 → C.2 → C.3 ↓ C.4, C.5, C.6 (parallel) ↓ C.8 C.7 (independent, do last) ``` ## Out of scope - Adding new entities or chapters (the WoN example is complete at 988 entities) - Re-running collection checks from scratch (existing results are valid) - Publishing the example as a standalone dataset