Updated workplan with comprehensive completion summary documenting successful release of v0.10.0 following Standard Track (Stages 1-2). **Completion Summary**: - Stage 1: Critical Fixes ✅ (~45 min) - Fixed setuptools-scm configuration - Created v0.9.0 retroactive tag - Prepared CHANGELOG for v0.10.0 - Stage 2: CHANGELOG Schema ✅ (~90 min) - Created changelog-schema-v1.0.md (360 lines) - Implemented x-markitect extensions - Successfully validates project CHANGELOG.md - All semantic checks passing **Release**: v0.10.0 (2026-01-06) **Philosophy**: "The release that validates itself" - Uses its own schema system to validate CHANGELOG.md - Perfect showcase of schema evolution practical value **Deferred Work**: - Stage 3: Release capability enhancements (future) - Stage 4: Schema system extensions (not needed) Updated status from "Planning" to "Stages 1-2 Complete, v0.10.0 Released"
Release Management Optimization
Created: 2026-01-06 Status: Planning → Ready to implement Priority: High (blocks v0.10.0 release)
Quick Summary
Enhance release management with robust validation using the schema system we just built. Creates a perfect showcase: validate CHANGELOG.md with a changelog schema.
Critical Issues Found
- setuptools-scm bug: Missing tag_regex →
markitect --versionreturns "unknown" - Missing v0.9.0 tag: CHANGELOG says v0.9.0 released but git tag never created
- No validation: No checks for CHANGELOG format or version-tag consistency
Solution
Create changelog-schema-v1.0.md to validate Keep a Changelog format, integrate into release workflow. Demonstrates schema evolution in action!
Staged Approach
- Stage 1 (45 min): Critical fixes → unblock v0.10.0 release
- Stage 2 (2.5 hrs): CHANGELOG schema → showcase feature
- Stage 3 (2 hrs): Release tooling enhancements
- Stage 4 (optional): Schema extensions (hooks/agents)
Recommended: Standard Track (Stages 1-3) = 5 hours for production-ready release management
Files
WORKPLAN.md- Detailed staged implementation planDONE.md- Completion checklist (when finished)
Philosophy
"Use the tools we build to improve the tools we build."
Release v0.10.0 becomes: The release that validates itself 🎯