tegwick 9e8d73fa7d docs(roadmap): close out infospace tooling S3 and parent roadmap
All three stages of the infospace tooling roadmap are complete. The Wealth
of Nations / VSM example passes 6/6 viability thresholds on 988 entities,
and composition is demonstrated via the supply-chain-vsm example.

- Parent roadmap (roadmap/infospace-tooling/PLAN.md): header now shows the
  closed status with final validation metrics.
- S3 close-out plan (roadmap/infospace-s3-closeout/PLAN.md): records the
  final task dispositions. C.1–C.6 and C.8 done; C.7 (clean per-chapter
  git history) is deferred indefinitely — the task was cosmetic, its
  prerequisite branch no longer exists, and reconstructing 35 archival
  commits would not change any output files. Rationale documented inline.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>