Files
reuse-surface/history/2026-06-15-intent-scope-assessment.md
tegwick 3cbf2109d3
Some checks failed
ci / validate-registry (push) Has been cancelled
Add post-WP-0011 assessment history and REUSE-WP-0012 workplan
Archive INTENT↔SCOPE assessment in history/ and map gap priorities
18–23 to follow-up tasks for federation scale and intent alignment.
2026-06-16 00:33:36 +02:00

5.0 KiB
Raw Blame History

INTENT ↔ SCOPE State Assessment — reuse-surface

Date: 2026-06-15
Author: codex
Trigger: Post-REUSE-WP-0011 review; SCOPE.md and docs/IntentScopeGapAnalysis.md refreshed (commit 5fcca42).
Follow-up workplan: workplans/REUSE-WP-0012-federation-scale-and-intent-alignment.md


1. Executive summary

reuse-surface has completed its MVP-through-hub roadmap (REUSE-WP-0001 … REUSE-WP-0011). The registry product delivers 20 helix_forge capabilities, A3 CLI tooling, a production federation hub at A4 (https://reuse.coulomb.social), federation compose, catalog/graph UIs, and 20 pytest tests with CI gates.

INTENT and SCOPE are aligned on the core model (registry-first, four maturity dimensions, human/agent consumers). Remaining work shifts from “build the registry” to scale federation membership, planning analytics, and operational hardening.

Self-assessed product vector: D5 / A4 / C4 / R3


2. Delivery snapshot

Area State (2026-06-15)
Capability entries 20 in registry/capabilities/
Index registry/indexes/capabilities.yaml
CLI commands validate, query, export, overlaps, catalog, federation, graph, hub, serve
Hosted hub Railiance01 92.205.62.239; TLS live; image cb7a6e4
Hub registrations 1 (reuse-surface → 12 capabilities on /v1/federated)
Federation (local) sources.yaml + HTTP cache; federated.yaml composed in CI
Tests 20 pytest; CI validate + federation + catalog + graph
Workplans WP-0001 … WP-0011 finished; WP-0011 archived
Landing page railiance-apps RAILIANCE-WP-0008 at / (browser only)

3. INTENT alignment

Aligned

  • Registry-first boundary (unregistered = invisible)
  • Four maturity dimensions with internal/external evidence separation
  • Human and agent consumption surfaces
  • Technical foundation (“eventually technical”) — met at MVP: CLI + hub API
  • Planning vs implementation reuse distinction in schema and workflows

Partial

INTENT expectation Gap
Cross-repo / organizational reuse All entries helix_forge; hub has one member
Eight success criteria fully met Analytics, D7 tracking, “reuse as normal” still partial
Consumer reliability evidence Catalog mostly R0R2; no registry telemetry

Drift (documentation)

  • INTENT.md “Initial Repository Role” tree predates reuse_surface/hub/, Dockerfile, workplans/archived/, hub specs
  • INTENT example entry uses external_evidence.*.current; schema uses level

4. Success criteria scorecard

Criterion Verdict
Find reusable capabilities before rebuilding Yes (MVP)
Compare maturity consistently Yes
Distinguish conceptual readiness from delivery Yes
Distinguish internal vs external evidence Yes
Plan prototype/MVP/enhancement/platform work Partial
Identify gaps, duplicates, overlaps, standardization Partial
Track progress to generalized capabilities Partial
Make reuse normal in product/architecture work Partial

5. Completeness and reliability

Completeness vs INTENT: C4 (Broadly Covered)

Core registry, tooling, and hub are in place. Federation membership and planning analytics are the main bounded gaps.

Reliability vs INTENT: R3 (Usable)

CI, pytest, and production hub smoke checks support normal workflows. Not yet R4 Dependable — no documented SLO, formal consumer feedback, or multi-replica hub posture.


6. Open gaps (priorities 1823)

Priority Gap Suggested outcome
18 Sibling hub registrations state-hub + one other repo on hub
19 hub sync Write sources.yaml from hub state
20 Planning cohort reports D5+/A4+ candidate export views
21 INTENT layout sync Update INTENT.md tree and example shape
22 Hub hardening Backup, Postgres option, documented SLO
23 External evidence program Raise catalog R levels with feedback fields

Captured in docs/IntentScopeGapAnalysis.md section 8 and REUSE-WP-0012.


7. Recommendations

  1. Execute REUSE-WP-0012 in federation-first order: hub membership and hub sync before analytics and hardening.
  2. Coordinate sibling repos — hub registration is blocked until domains publish raw capabilities.yaml URLs (document publish contract in WP-0012).
  3. Refresh INTENT.md early in WP-0012 to reduce contributor confusion.
  4. Defer A6 hub posture until multi-replica or backup requirements are explicit; current SQLite single-replica is acceptable for helix_forge scale.

8. References

  • INTENT.md — product north star
  • SCOPE.md — delivery truth (updated 2026-06-15)
  • docs/IntentScopeGapAnalysis.md — living gap tracker
  • docs/RegistryFederation.md — hub + local compose workflows
  • specs/FederationHubAPI.md — hub API contract
  • workplans/archived/260615-REUSE-WP-0011-*.md — hub delivery record