generated from coulomb/repo-seed
Some checks failed
ci / validate-registry (push) Has been cancelled
SCOPE reflects 20 capabilities, production hub (A4), and current limits. Gap analysis closes historical MVP gaps and proposes priorities 18–23. Self-assessed product vector: D5 / A4 / C4 / R3.