# Decision: Confirm initial activation levels
|
||||
|
||||
Status: Open
|
||||
Date: 2026-06-22
|
||||
Record: DEC-001
|
||||
|
||||
## Context
|
||||
|
||||
`PROJECT_LANDSCAPE.md` assigns activation levels to each organization in the
|
||||
forge landscape. These levels govern how much delivery pressure each topic
|
||||
receives and which items may become commitments.
|
||||
|
||||
## Options
|
||||
|
||||
### Option 1 — Accept draft levels as proposed
|
||||
|
||||
| Organization | Level |
|
||||
|---|---|
|
||||
| binky | A3 Critical |
|
||||
| tegwick | A2 Active |
|
||||
| helix | A2 Active |
|
||||
| coulomb | A1/A2 Controlled |
|
||||
| sloppers | A1 Incubating |
|
||||
| whywhynot | A1 Incubating |
|
||||
| plenitude | A1 Incubating |
|
||||
|
||||
### Option 2 — Adjust before accepting
|
||||
|
||||
Change one or more levels after review of current energy, obligations, and
|
||||
survival priorities.
|
||||
|
||||
### Option 3 — Defer
|
||||
|
||||
Keep levels as draft annotations until Binky critical path is visible
|
||||
(TEGWICK-WP-0003).
|
||||
|
||||
## Decision
|
||||
|
||||
Pending human confirmation.
|
||||
|
||||
## Rationale
|
||||
|
||||
(To be filled when accepted or rejected.)
|
||||
|
||||
## Consequences
|
||||
|
||||
Accepted levels flow into area cards, `TASKS.md` prioritization, and agent task
|
||||
approval boundaries.
|
||||
|
||||
## Review
|
||||
|
||||
Revisit during monthly landscape review or when Binky stabilization changes
|
||||
survival pressure.
|
||||