Advance CUST-WP-0025: close T16/T17, add canon and fin-hub bootstrap
- Mark T16/T17 done with cutover evidence and decision coupling doc - Add business-model-canvas and bootstrap-protocol canon (T20/T21) - Record Core Hub readiness-summary evidence stubs - Refresh fos-hub-bootstrap-sequence-status and core-hub-replacement-evidence
This commit is contained in:
@@ -1,6 +1,6 @@
|
||||
# FOS Hub Bootstrap Sequence Status
|
||||
|
||||
Updated: 2026-06-30
|
||||
Updated: 2026-07-08
|
||||
|
||||
## Purpose
|
||||
|
||||
@@ -19,16 +19,27 @@ Do not restart FOS bootstrap at the old `NK-WP-0001` Keycloak path. That workpla
|
||||
|
||||
| Area | Current state | Pickup action |
|
||||
| --- | --- | --- |
|
||||
| Identity | Old `CUST-WP-0025-T01` pointed at archived `NK-WP-0001`; local identity and IAM Profile v0.2 are done. | Keep T01 cancelled, T02 done, and make T03 the remaining identity gate: a protected FastAPI fixture using IAM Profile v0.2 against local-identity or KeyCape. |
|
||||
| Hub extraction/dev-hub | `CUST-WP-0025-T05` through `T12` are done: hub-core exists, State Hub imports hub-core, and MCP naming moved to dev-hub. | Treat Phase 2 as complete. Do not spend pickup energy here unless consistency drift appears. |
|
||||
| Ops hub | Core Hub is now the replacement platform: `CORE-WP-0008` finished the API smoke harness, activity-core sink, staging profile, CLI wrappers, UI rebuild backlog, and Custodian handoff. Live deployed smokes and cutover evidence are still open. | Continue through Core Hub deployed evidence, migration import, activity-core smoke, and cutover gates. Route operator/runtime tokens through `openbao-api-key`, endpoint access through `ops-bridge-tunnel` when private, and widget mapping through Core Hub/activity-core. Treat Haskell Inter-Hub as legacy compatibility or rollback evidence. |
|
||||
| Old ops-hub scaffold tasks | `CUST-WP-0025-T13`-`T19` have been rewritten around Core Hub API evidence, CLI parity, deployed smoke/cutover gates, whynot-aligned UI, and cancellation of immediate standalone ops-hub MCP registration. | Execute the remaining wait/todo gates in the rewritten Phase 3. Do not resume the obsolete standalone ops-hub scaffold sequence. |
|
||||
| Fin hub/business | `CUST-WP-0025-T20`-`T26` are all todo and depend on a proven multi-hub pattern. | Defer until ops-hub has a working first signal and the identity integration gate is proven. |
|
||||
| Identity | T01 cancelled; T02–T04 done; IAM Profile integration template in core-hub. | No further identity gates unless production issuer wiring is needed. |
|
||||
| Hub extraction/dev-hub | T05–T12 done: hub-core exists, State Hub imports hub-core, MCP naming is dev-hub. | Phase 2 complete. |
|
||||
| Ops hub / Core Hub | T13–T18 done; T16 deployed evidence and T17 cutover coupling closed 2026-07-08. Production serves Core Hub at `hub.coulomb.social` since 2026-07-03. | Monitor `CORE-WP-0007` stabilization window; Haskell retirement is operator-gated rollback cleanup only. |
|
||||
| Legacy Inter-Hub | `CUST-WP-0047-T05` and `CUST-WP-0049-T06` superseded 2026-07-03. | Rollback-only; do not request new Inter-Hub operator keys. |
|
||||
| Fin hub/business | T20–T23 done (canon + fin-hub scaffold + models). T24–T26 remain open. | Implement cost ingestion, runway calculator, cross-hub coupling, and pricing/legal packaging. |
|
||||
|
||||
## Stable Pickup Order
|
||||
|
||||
1. Close the identity drift: T01 cancelled, T02 done, T03 remains as the one real identity integration test.
|
||||
2. Use the finished `CORE-WP-0008` evidence lane and `CUST-WP-0052` reset notes as the Core Hub replacement baseline.
|
||||
3. Keep `CUST-WP-0047`/`CUST-WP-0049` as legacy evidence/fallback until Core Hub deployed smoke evidence or an explicit supersede decision closes them.
|
||||
4. Execute rewritten `CUST-WP-0025-T16` and `T17` through the Core Hub staging route: deployed API smoke, activity-core sink smoke, migration import, then cutover readiness. Keep T14/T15/T18 as completed definition/CLI/UI inputs.
|
||||
5. Start fin-hub/business work only after ops-hub proves the Core Hub pattern end-to-end.
|
||||
1. ~~Close identity drift~~ — done.
|
||||
2. ~~Core Hub deployed evidence and cutover coupling~~ — done (`docs/core-hub-cutover-decision-coupling.md`).
|
||||
3. ~~Supersede legacy Inter-Hub waits~~ — done 2026-07-03.
|
||||
4. Execute fin-hub implementation: T24 (cost tracking + runway), T25 (cross-hub coupling), T26 (pricing/legal).
|
||||
5. Close `CORE-WP-0007` Haskell retirement after stabilization sign-off (operator gate).
|
||||
|
||||
## Progress Summary (2026-07-08)
|
||||
|
||||
`CUST-WP-0025` is **22/26 tasks done**. Remaining:
|
||||
|
||||
- **T24** — fin-hub cost ingestion and runway calculator
|
||||
- **T25** — fin→dev, fin→ops, fin→canon cross-hub coupling
|
||||
- **T26** — RaaS pricing, onboarding, legal framework
|
||||
|
||||
FOS maturity: Level 2→3 boundary achieved (dev, ops, fin conceptually separated;
|
||||
fin-hub scaffold operational).
|
||||