# Core Hub Cutover Decision Coupling Date: 2026-07-08 Related workplans: `CUST-WP-0025-T17`, `CORE-WP-0005`, `CORE-WP-0007`, `CUST-WP-0047`, `CUST-WP-0049`. ## Decision Summary Core Hub is the **preferred production framework surface** for ops evidence and hub registry work. Haskell Inter-Hub remains available as **rollback-only** fallback through the stabilization window and until `CORE-WP-0007` operator sign-off retires it. | Question | Decision | | --- | --- | | Is legacy Inter-Hub still required for normal operation? | **No** — production ingress at `hub.coulomb.social` serves Core Hub since 2026-07-03. | | Is Inter-Hub fallback still required? | **Yes, rollback-only** until stabilization closes and `CORE-WP-0007-T02` is approved. | | Are the three cutover gates satisfied? | **Yes** — deployed API smoke, staging import, and activity-core sink evidence all pass. | | Can Phase 4 fin-hub work begin? | **Yes** — multi-hub pattern is proven at Level 2→3 boundary; fin models remain separate implementation. | ## Readiness Gates Evidence stubs live under `docs/evidence/` and aggregate through Core Hub `readiness-summary`: ```bash cd /home/worsch/core-hub make operator-cli CLI_ARGS="readiness-summary \ --deployed-smoke-report /home/worsch/the-custodian/docs/evidence/core-hub-deployed-smoke-20260702235645.json \ --migration-report /home/worsch/the-custodian/docs/evidence/core-hub-migration-import-20260703.json \ --activity-core-report /home/worsch/the-custodian/docs/evidence/core-hub-activity-core-sink-20260702.json" ``` Required gates: | Gate | Status | Evidence | | --- | --- | --- | | `deployed_api_smoke` | pass | run `20260702235645-59bf1e` (production); staging `20260702143544-6c8f18` | | `staging_import` | pass | 28 records imported idempotently; production reconcile 0/28/0 | | `activity_core_sink` | pass | event `ae43db56-902d-411a-a495-25acd464fdd8` posted and verified | | `legacy_inter_hub_reference` | optional | retained for rollback validation only | ## Public Stabilization Probes (2026-07-08) Unauthenticated checks against `https://hub.coulomb.social`: | Endpoint | Expected | Observed | | --- | --- | --- | | `/healthz` | 200 | 200 (`service: core-hub`) | | `/readyz` | 200 | 200 (`configuration`, `database_url`, `api_auth` ok) | | `/api/v2/widget-types` | 200 | 200 | | `/api/v2/hubs` | 401 | 401 (hardened contract) | ## Consumer Compatibility Notes Consumers migrating from Inter-Hub `/api/v2` must account for: 1. **Auth hardening** — `/api/v2/hubs` is protected on Core Hub. Anonymous listing consumers must obtain a token. Audit found no production dependency on anonymous 200 responses. 2. **Catalog shape** — Core Hub catalogs use `{name, slug, description}`; Inter-Hub used `{name, label, description, ownerHubId, status}`. Parsers must accept `slug` as the stable identifier. 3. **Health endpoints** — Core Hub adds `/healthz` and `/readyz`; Inter-Hub returned 404 on these paths. 4. **Ops vocabulary** — all 7 orphaned `ops-*` widget types and matching event types are seeded in Core Hub before cutover; migrated widgets are referentially complete. ## Rollback and Haskell Retirement Gates Rollback remains one ingress flip: 1. Delete Core Hub ingress (`30-ingress.yaml`) 2. Apply `rollback-inter-hub-ingress.yaml` 3. Inter-Hub deployment stays running untouched through stabilization `CORE-WP-0007` Haskell retirement requires: - stabilization window close (through 2026-07-10T17:35Z per workplan) - operator approval after repeated public probe pass - explicit decision that rollback is no longer operationally required ## Supersede Decisions | Legacy task | Superseded by | Date | | --- | --- | --- | | `CUST-WP-0047-T05` Inter-Hub widget activation | Core Hub production cutover + deployed smoke | 2026-07-03 | | `CUST-WP-0049-T06` Inter-Hub bootstrap access lane | Core Hub operator CLI + deployed evidence | 2026-07-03 | Do not request new Inter-Hub operator keys for the preferred replacement lane. ## Cross-Hub Coupling (FOS §9) | From | To | Signal | | --- | --- | --- | | Core Hub (ops) | dev-hub (State Hub) | progress/decision records, workplan status | | activity-core | Core Hub | `core-hub-interaction-event` sink | | fin-hub (future) | dev-hub | budget pressure alerts (T25) | | fin-hub (future) | Core Hub | per-service cost attribution (T25) | NATS transport for cross-hub messaging remains a later decision; HTTP evidence sinks and State Hub progress records are sufficient for the current cutover gate.