# FOS Hub Bootstrap Sequence Status Updated: 2026-07-08 ## Purpose Track `CUST-WP-0051-T07` and `CUST-WP-0052`: sequence `CUST-WP-0025` so FOS Hub bootstrap can resume from current repo reality rather than the older mega-hub/Keycloak/Inter-Hub assumptions. ## Current Decision Do not restart FOS bootstrap at the old `NK-WP-0001` Keycloak path. That workplan is archived and superseded. The active identity baseline is: - `NK-WP-0002` local identity: complete; usable for bootstrap/dev OIDC. - `NK-WP-0012` IAM Profile v0.2: finished; canonical NetKingdom-owned profile and conformance suite. - KeyCape/Authelia/LLDAP stack from the superseding NetKingdom path: current lightweight identity mode. - `NK-WP-0011` expanded-mode Keycloak: proposed enterprise federation lane, not a blocker for ops-hub bootstrap. ## Sequence Board | Area | Current state | Pickup action | | --- | --- | --- | | Identity | T01 cancelled; T02–T04 done; IAM Profile integration template in core-hub. | No further identity gates unless production issuer wiring is needed. | | Hub extraction/dev-hub | T05–T12 done: hub-core exists, State Hub imports hub-core, MCP naming is dev-hub. | Phase 2 complete. | | Ops hub / Core Hub | T13–T18 done; T16 deployed evidence and T17 cutover coupling closed 2026-07-08. Production serves Core Hub at `hub.coulomb.social` since 2026-07-03. | Monitor `CORE-WP-0007` stabilization window; Haskell retirement is operator-gated rollback cleanup only. | | Legacy Inter-Hub | `CUST-WP-0047-T05` and `CUST-WP-0049-T06` superseded 2026-07-03. | Rollback-only; do not request new Inter-Hub operator keys. | | Fin hub/business | T20–T23 done (canon + fin-hub scaffold + models). T24–T26 remain open. | Implement cost ingestion, runway calculator, cross-hub coupling, and pricing/legal packaging. | ## Stable Pickup Order 1. ~~Close identity drift~~ — done. 2. ~~Core Hub deployed evidence and cutover coupling~~ — done (`docs/core-hub-cutover-decision-coupling.md`). 3. ~~Supersede legacy Inter-Hub waits~~ — done 2026-07-03. 4. Execute fin-hub implementation: T24 (cost tracking + runway), T25 (cross-hub coupling), T26 (pricing/legal). 5. Close `CORE-WP-0007` Haskell retirement after stabilization sign-off (operator gate). ## Progress Summary (2026-07-08) `CUST-WP-0025` is **22/26 tasks done**. Remaining: - **T24** — fin-hub cost ingestion and runway calculator - **T25** — fin→dev, fin→ops, fin→canon cross-hub coupling - **T26** — RaaS pricing, onboarding, legal framework FOS maturity: Level 2→3 boundary achieved (dev, ops, fin conceptually separated; fin-hub scaffold operational).