- Mark T16/T17 done with cutover evidence and decision coupling doc - Add business-model-canvas and bootstrap-protocol canon (T20/T21) - Record Core Hub readiness-summary evidence stubs - Refresh fos-hub-bootstrap-sequence-status and core-hub-replacement-evidence
2.6 KiB
2.6 KiB
FOS Hub Bootstrap Sequence Status
Updated: 2026-07-08
Purpose
Track CUST-WP-0051-T07 and CUST-WP-0052: sequence CUST-WP-0025 so FOS Hub bootstrap can resume from current repo reality rather than the older mega-hub/Keycloak/Inter-Hub assumptions.
Current Decision
Do not restart FOS bootstrap at the old NK-WP-0001 Keycloak path. That workplan is archived and superseded. The active identity baseline is:
NK-WP-0002local identity: complete; usable for bootstrap/dev OIDC.NK-WP-0012IAM Profile v0.2: finished; canonical NetKingdom-owned profile and conformance suite.- KeyCape/Authelia/LLDAP stack from the superseding NetKingdom path: current lightweight identity mode.
NK-WP-0011expanded-mode Keycloak: proposed enterprise federation lane, not a blocker for ops-hub bootstrap.
Sequence Board
| Area | Current state | Pickup action |
|---|---|---|
| Identity | T01 cancelled; T02–T04 done; IAM Profile integration template in core-hub. | No further identity gates unless production issuer wiring is needed. |
| Hub extraction/dev-hub | T05–T12 done: hub-core exists, State Hub imports hub-core, MCP naming is dev-hub. | Phase 2 complete. |
| Ops hub / Core Hub | T13–T18 done; T16 deployed evidence and T17 cutover coupling closed 2026-07-08. Production serves Core Hub at hub.coulomb.social since 2026-07-03. |
Monitor CORE-WP-0007 stabilization window; Haskell retirement is operator-gated rollback cleanup only. |
| Legacy Inter-Hub | CUST-WP-0047-T05 and CUST-WP-0049-T06 superseded 2026-07-03. |
Rollback-only; do not request new Inter-Hub operator keys. |
| Fin hub/business | T20–T23 done (canon + fin-hub scaffold + models). T24–T26 remain open. | Implement cost ingestion, runway calculator, cross-hub coupling, and pricing/legal packaging. |
Stable Pickup Order
Close identity drift— done.Core Hub deployed evidence and cutover coupling— done (docs/core-hub-cutover-decision-coupling.md).Supersede legacy Inter-Hub waits— done 2026-07-03.- Execute fin-hub implementation: T24 (cost tracking + runway), T25 (cross-hub coupling), T26 (pricing/legal).
- Close
CORE-WP-0007Haskell retirement after stabilization sign-off (operator gate).
Progress Summary (2026-07-08)
CUST-WP-0025 is 22/26 tasks done. Remaining:
- T24 — fin-hub cost ingestion and runway calculator
- T25 — fin→dev, fin→ops, fin→canon cross-hub coupling
- T26 — RaaS pricing, onboarding, legal framework
FOS maturity: Level 2→3 boundary achieved (dev, ops, fin conceptually separated; fin-hub scaffold operational).