Initial repo seeding

This commit is contained in:
2026-05-23 03:39:47 +02:00
commit 060556b375
27 changed files with 930 additions and 0 deletions

91
WORKPLAN.md Normal file
View File

@@ -0,0 +1,91 @@
# Workplan
## Goal
Establish `whynot-control` as the control repository for prototype exploration, market-signal capture, and early validation.
## Phase 0 — Create the Repository
### Objective
Create the initial repo structure and seed the core documents.
### Tasks
- Create `whynot-control` in the `whynot` Gitea organization.
- Add core documents.
- Create `inbox/`, `prototypes/`, `signals/`, `betas/`, `offers/`, `templates/`, and `agent-tasks/`.
### Done When
The repository exists and provides a first usable control surface for prototype exploration.
## Phase 1 — Establish Intake
Create a reliable way to capture and triage ideas.
Tasks:
- Define intake rules.
- Add the prototype card template.
- Add the signal record template.
- Add the experiment record template.
- Add the beta plan template.
- Define when an idea becomes a prototype candidate.
## Phase 2 — Seed Initial Prototype Candidates
Create the first small set of prototype cards.
Tasks:
- Identify 37 candidate ideas.
- Write a prototype card for each.
- Assign lifecycle stage.
- Assign likely promotion target.
- Define smallest useful test.
## Phase 3 — Define Signal Capture
Make feedback and market signal visible.
Tasks:
- Define signal strength scale.
- Create first signal records.
- Connect signals to prototype cards.
- Identify weak vs strong evidence.
## Phase 4 — Prepare Closed Beta Model
Create a controlled path for early users and feedback.
Tasks:
- Define beta types.
- Define beta entry criteria.
- Define beta exit outcomes.
- Create a first beta plan template.
## Phase 5 — Define Promotion Criteria
Prevent premature productization while enabling strong ideas to move forward.
Tasks:
- Define promotion criteria for Helix.
- Define promotion criteria for Coulomb.
- Define promotion criteria for Sloppers.
- Define promotion criteria for Plenitude.
- Define when Binky must be involved.
## Phase 6 — Connect to Tegwick Landscape
Ensure `whynot` remains aligned with the broader project landscape.
Tasks:
- Add a reference from `tegwick-control`.
- Confirm activation level.
- Document dependencies.
- Create initial review rhythm.