ui rules established

This commit is contained in:
2026-06-22 23:03:40 +02:00
parent 4bc5111dfd
commit 59b3b73061
5 changed files with 33 additions and 40 deletions

View File

@@ -1,11 +1,11 @@
## First Session Protocol
Triggered when `get_domain_summary("custodian")` shows **no workstreams**.
Triggered when `get_domain_summary("infotech")` shows **no workstreams**.
The project is registered but work has not yet been structured.
**Step 1 — Read, don't write**
- `~/the-custodian/canon/projects/custodian/project_charter_v0.1.md` — purpose, scope
- `~/the-custodian/canon/projects/custodian/roadmap_v0.1.md` — planned phases
- `~/the-custodian/canon/projects/infotech/project_charter_v0.1.md` — purpose, scope
- `~/the-custodian/canon/projects/infotech/roadmap_v0.1.md` — planned phases
- Scan repo root: README, directory structure, existing code or docs
**Step 2 — Survey in-progress work**
@@ -17,7 +17,7 @@ roadmap phase. **Wait for approval before creating.**
**Step 4 — Create workplan file first, then DB record (ADR-001)**
```
workplans/activity-core-WP-NNNN-<slug>.md ← write this first
workplans/ACTIVITY-WP-NNNN-<slug>.md ← write this first
```
Then register in the hub:
```
@@ -28,7 +28,7 @@ create_task(workstream_id="<id>", title="...", priority="high|medium|low")
**Step 5 — Record the setup**
```
add_progress_event(
summary="First session: structured custodian into N workstreams, M tasks",
summary="First session: structured infotech into N workstreams, M tasks",
event_type="milestone",
topic_id="cee7bedf-2b48-46ef-8601-006474f2ad7a",
detail={"workstreams": [...], "tasks_created": M}

View File

@@ -1,5 +1,5 @@
**Purpose:** Durable task factory built on Temporal. Manages ActivityDefinitions, schedules recurring workflows via Temporal Schedules, routes events via NATS JetStream, and exposes a FastAPI CRUD surface for the custodian domain.
**Domain:** custodian
**Domain:** infotech
**Repo slug:** activity-core
**Topic ID:** cee7bedf-2b48-46ef-8601-006474f2ad7a

View File

@@ -1,6 +1,7 @@
## Session Protocol
State Hub: http://127.0.0.1:8000
Dev Hub (State Hub API): http://127.0.0.1:8000
MCP server name in `~/.claude.json`: `dev-hub`
**Step 1 — Orient**
@@ -10,7 +11,7 @@ cat .custodian-brief.md
```
Then call the MCP tool for richer cross-domain context when MCP tools are exposed:
```
get_domain_summary("custodian")
get_domain_summary("infotech")
```
If MCP tools are unavailable in the current agent session, use the REST API:
```bash
@@ -39,11 +40,11 @@ curl -s -X PATCH "http://127.0.0.1:8000/messages/<id>/read" \
ls workplans/
```
For each file with `status: ready`, `active`, or `blocked`, note pending
`todo`/`in_progress` tasks.
`wait`/`todo`/`progress` tasks.
**Step 4 — Present brief**
1. **Active workstreams** for `custodian` — title, task counts, blocking decisions
1. **Active workstreams** for `infotech` — title, task counts, blocking decisions
2. **Pending tasks** from `workplans/` + any `[repo:activity-core]` hub tasks
3. **Goal guidance** — if `goal_guidance` in summary:
- `needs_workplan`: surface as top action — *"Repo goal '{title}' has no workplan yet"*

View File

@@ -1,7 +1,7 @@
## Workplan Convention (ADR-001)
File location: `workplans/activity-core-WP-NNNN-<slug>.md`
ID prefix: `ACTIVITY-WP`
File location: `workplans/ACTIVITY-WP-NNNN-<slug>.md`
ID prefix: `ACTIVITY-WP-`
Work items originate as files in this repo **before** being registered in the hub.
@@ -12,7 +12,7 @@ repo state, and `finished` when implementation is complete. `stalled` and
`needs_review` are derived health labels, not stored statuses.
Closed workplans may be moved to `workplans/archived/` with a completion-date
prefix: `YYMMDD-activity-core-WP-NNNN-<slug>.md`. The frontmatter id remains
prefix: `YYMMDD-ACTIVITY-WP-NNNN-<slug>.md`. The frontmatter id remains
unchanged; the prefix is only for quick visual reference.
Small opportunistic tasks discovered during another session use **Ad Hoc Tasks**:
@@ -25,4 +25,16 @@ Ecosystem todos from other agents arrive as `[repo:activity-core]` hub tasks —
visible at session start. Pick one up by creating the workplan file, then registering
the workstream.
Task blocks use this shape:
```task
id: ACTIVITY-WP-NNNN-T01
status: wait | todo | progress | done | cancel
priority: high | medium | low
state_hub_task_id: "<uuid>" # written by fix-consistency — do not edit
```
Status progression is `todo``progress``done`; use `wait` for waiting or
blocked work and `cancel` for stopped work.
<!-- Ralph Loop rules and HEUREKA sequence: ~/.claude/CLAUDE.md — do not duplicate here -->

View File

@@ -4,7 +4,7 @@
**Purpose:** Durable task factory built on Temporal. Manages ActivityDefinitions, schedules recurring workflows via Temporal Schedules, routes events via NATS JetStream, and exposes a FastAPI CRUD surface for the custodian domain.
**Domain:** custodian
**Domain:** infotech
**Repo slug:** activity-core
**Topic ID:** `cee7bedf-2b48-46ef-8601-006474f2ad7a`
**Workplan prefix:** `ACTIVITY-WP-`
@@ -83,7 +83,7 @@ curl -s -X PATCH "http://127.0.0.1:8000/tasks/<task_id>" \
1. `cat .custodian-brief.md` — domain goal and open workstreams (offline-safe)
2. Check inbox: `GET /messages/?to_agent=activity-core&unread_only=true`; mark read
3. Scan workplans: `ls workplans/` — note `status: ready`, `active`, or `blocked` files and open tasks
4. Check blocked tasks: `GET /tasks/?needs_human=true`
4. Check human-needed tasks: `GET /tasks/?needs_human=true`
**During work:**
- Update task statuses in workplan files as tasks progress
@@ -151,27 +151,10 @@ every repo's agent instructions because it is high-frequency, high-risk, and eas
get wrong.
**Canon:** `~/ops-warden/wiki/CredentialRouting.md` · catalog `~/ops-warden/registry/routing/catalog.yaml`
---
## Issue-core emission (`ISSUE_SINK_TYPE=rest`)
activity-core emits tasks to issue-core via `IssueCoreRestSink` (`src/activity_core/issue_sink.py`).
**Do not request `ISSUE_CORE_API_KEY` from ops-warden** — ops-warden issues SSH
certs only. For routing: `warden route show activity-core-issue-sink --json`.
| Env var | Purpose |
| --- | --- |
| `ISSUE_CORE_URL` | issue-core base URL (default `http://127.0.0.1:8765`) |
| `ISSUE_CORE_API_KEY` | Shared ingestion key — sent as `Authorization: Bearer` |
| `ISSUE_SINK_TYPE` | `rest` (live POST) or `null` (dry-run; Railiance default) |
**Local dev:** generate one key, export on both activity-core and issue-core
processes. See `docs/issue-core-emission-boundary.md` and issue-core `README.md`.
Use `default: local` in issue-core `backends.json` for local smoke.
**Production:** inject the same key on both sides via OpenBao/K8s (coordinate
`railiance-platform` when the canonical path ships).
<!-- REPO-AGENTS-EXTENSIONS -->
<!-- Append repo-specific agent instructions below this marker.
The state-hub template sync preserves content after this line. -->
---
@@ -198,7 +181,7 @@ anything needing analysis, design, approval, dependencies, or multiple phases.
id: ACTIVITY-WP-NNNN
type: workplan
title: "..."
domain: custodian
domain: infotech
repo: activity-core
status: proposed | ready | active | blocked | backlog | finished | archived
owner: codex
@@ -228,10 +211,7 @@ state_hub_task_id: "<uuid>" # written by fix-consistency — do not edit
Task description text.
```
Status progression: `todo` → `progress` → `done`; use `wait` for a task
blocked on external input and `cancel` for intentionally abandoned work.
Workstream/workplan lifecycle status is separate; frontmatter `blocked` remains
valid there.
Status progression: `todo` → `progress` → `done`; use `wait` for waiting/blocked work and `cancel` for stopped work.
To create a new workplan:
1. Write the file following the format above