Files
coulomb-loop/workplans/LOOP-WP-0000-engagement-bootstrap.md
tegwick 25f31c3851 feat: complete LOOP-WP-0000 bootstrap — reuse-surface capability D0
Register capability.coulomb-social.loop-orchestrate; validate passes.
Mark engagement bootstrap workplan done (8/8 tasks).
2026-06-18 11:02:05 +02:00

150 lines
4.0 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
id: LOOP-WP-0000
type: workplan
title: "Engagement bootstrap (registration, assessment, governance)"
domain: coulomb_social
repo: coulomb-loop
status: done
owner: coulomb-loop
topic_slug: coulomb_social
supplier: kaizen-agentic
created: "2026-06-18"
updated: "2026-06-18"
depends_on: []
tasks:
- id: T01
status: done
title: Register coulomb-loop in state-hub under coulomb_social
- id: T02
status: done
title: Persist initial codebase assessment in history/
- id: T03
status: done
title: Accept ADR-001 ADR-002 ADR-003 and publish decision proposals
- id: T04
status: done
title: Sync workplans to state-hub via fix-consistency
- id: T05
status: done
title: Open supplier track KAIZEN-WP-0008 in kaizen-agentic
- id: T06
status: done
title: Resolve DEC-001 through DEC-004 operator decisions
- id: T07
status: done
title: Fill SCOPE.md and .claude/rules integration stubs
- id: T08
status: done
title: Register reuse-surface capability entry for loop orchestration
state_hub_workstream_id: "0df6df54-4313-4c2d-93f2-dc6844fe47ec"
---
# LOOP-WP-0000 — Engagement Bootstrap
**Status:** done
**Owner:** coulomb-loop
**Purpose:** One-time (and ongoing governance) setup before loop automation runs.
## Goal
Establish `coulomb-loop` as a registered, governed customer engagement repo with
documented assessment, ADRs, pending decisions, and hub-indexed workplans — minimal
manual steps, maximum automation downstream.
## Register and assess (done 2026-06-18)
```task
id: LOOP-WP-0000-T01
status: done
priority: high
state_hub_task_id: "0d29d8a3-5326-4da2-8e5b-d78af13d7388"
```
`register_project.sh coulomb_social /home/worsch/coulomb-loop`; topic_id and description patched.
```task
id: LOOP-WP-0000-T02
status: done
priority: high
state_hub_task_id: "1ebb94ed-7a44-425f-bd32-862602d77817"
```
`history/2026-06-18-initial-codebase-assessment.md` committed.
```task
id: LOOP-WP-0000-T03
status: done
priority: high
state_hub_task_id: "5c300ba3-7bdf-4db7-96f5-cc3d5454eac1"
```
ADR-001003 accepted; DEC-001004 published under `docs/decisions/`.
```task
id: LOOP-WP-0000-T04
status: done
priority: high
state_hub_task_id: "f45e0ea8-ce58-4fee-8d30-f145b0c5beea"
```
`make fix-consistency REPO=coulomb-loop` — LOOP-WP-00010004 indexed.
```task
id: LOOP-WP-0000-T05
status: done
priority: high
state_hub_task_id: "0cb1f5be-26ea-4d85-9bd1-b30bb69ea127"
```
`kaizen-agentic/workplans/kaizen-agentic-WP-0008-coulomb-loop-supplier-engagement.md` created and synced.
## Completed (2026-06-18)
- state-hub registration (`coulomb_social`, topic `coulomb-social`)
- Repo description and topic_id patched via API
- `history/2026-06-18-initial-codebase-assessment.md`
- ADR-001 (LOOP-WP prefix), ADR-002 (boundary), ADR-003 (cadence ramp)
- DEC-001DEC-004 decision proposals
- LOOP-WP-00010004 synced (4 workstreams, 30 tasks)
- KAIZEN-WP-0008 opened in kaizen-agentic (supplier)
## Resolve operator decisions
```task
id: LOOP-WP-0000-T06
status: done
priority: high
state_hub_task_id: "97509454-9a93-4a80-a12b-e459f3cd01c5"
```
Accepted option A for DEC-001004 (2026-06-18). ADR-004 records diminishing-returns
repo rotation for later implementation (LOOP-WP-0004 T09). `loops/kaizen-stack/roster.yaml` created.
## Fill orientation files
```task
id: LOOP-WP-0000-T07
status: done
priority: medium
state_hub_task_id: "663661ef-ee8c-4fc6-a552-845d22163012"
```
SCOPE.md and `.claude/rules/{repo-identity,architecture,repo-boundary,stack-and-commands,workplan-convention}.md` filled.
## reuse-surface capability entry
```task
id: LOOP-WP-0000-T08
status: done
priority: low
state_hub_task_id: "54f5e683-0081-4db1-abdb-4f57323f840e"
```
`capability.coulomb_social.loop-orchestrate` at D0 in `registry/capabilities/`.
Index updated; `reuse-surface validate` passes (2026-06-18).
## Definition of done
- All DEC-* resolved or explicitly deferred with owner date
- SCOPE and rules files non-stub
- LOOP-WP-0001 unblocked for roster + schedule scaffold