Operator override per ADR-003 closes the stabilize observation window early (day 2/14) and promotes all four loops to weekly Mon crons. Activity definitions renamed coulomb-daily-* → coulomb-weekly-*; cadence.yml, dashboard, SCOPE, and health records updated. activity-core definition sync still required on operator side.
5.1 KiB
id, type, title, domain, repo, status, owner, topic_slug, supplier, created, updated, depends_on, tasks, state_hub_workstream_id
| id | type | title | domain | repo | status | owner | topic_slug | supplier | created | updated | depends_on | tasks | state_hub_workstream_id | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| LOOP-WP-0005 | workplan | Operate phase observation and fleet expansion prep | coulomb_social | coulomb-loop | done | coulomb-loop | coulomb_social | kaizen-agentic | 2026-06-18 | 2026-06-19 |
|
|
620731c9-ed7b-478d-97a2-5e251c2c36ff |
LOOP-WP-0005 — Operate Phase Observation & Fleet Expansion Prep
Status: done Owner: coulomb-loop Depends on: LOOP-WP-0000–0004 (bootstrap sprint complete)
Goal
Bridge stabilize (daily) to operate (weekly) across all four loops without
premature promotion. Refresh operator-facing health artefacts, start the ADR-003
14-day observation clock, and prepare the next fleet expansion (reuse-surface).
Context (2026-06-18)
| Loop | Phase | Primary mechanism |
|---|---|---|
| kaizen-improvement-stack | stabilize | daily coach/optimization chain |
| quality-escalation | stabilize | event low-success-rate-review + daily backup sweep |
| registry-hygiene | stabilize | daily sweep enabled (ACTIVITY-WP-0013) |
| loop-regulator | stabilize | daily collector 11:00 + weekly session Mon 11:00 |
Bootstrap sprint closed. Activity definitions renamed coulomb-daily-*. Worker
restarted; hot-reload capability suggested to activity-core (f4876517).
Refresh regulator dashboard
id: LOOP-WP-0005-T01
status: done
priority: high
state_hub_task_id: "669aa2e5-bc2f-409f-a170-52c2e5824577"
Completed 2026-06-18: loops/regulator/dashboard.md — daily defs, event path,
observation window, blockers.
Update engagement docs
id: LOOP-WP-0005-T02
status: done
priority: medium
state_hub_task_id: "b950ad21-7bd5-4ab5-864d-2e154fc5045a"
Completed 2026-06-18: SCOPE.md § Current State → stabilize phase.
Stabilize observation window
id: LOOP-WP-0005-T03
status: done
priority: high
state_hub_task_id: "868c3fa1-9d1d-4f69-af62-67d1142e529c"
Completed 2026-06-18: loops/regulator/stabilize-observation.yml:
started_at: 2026-06-18review_at: 2026-07-02(14 days)- Exit criteria per ADR-003:
false_positive_rate < 0.2,manual_rescues == 0
reuse-surface expansion prep
id: LOOP-WP-0005-T04
status: done
priority: medium
state_hub_task_id: "c6667e3e-3507-456d-baa0-a43c20e095ce"
Completed 2026-06-18: loops/registry-hygiene/expansion-reuse-surface.yml — no
.kaizen/ yet; onboarding path documented; helix_forge rollout active; blocked on
shell resolver before hygiene batch promotion.
Operate-phase draft
id: LOOP-WP-0005-T05
status: done
priority: low
state_hub_task_id: "07554dce-03d6-42b2-8080-6071482c4f3a"
Completed 2026-06-18: operate_target blocks added to all four loops/*/cadence.yml
files (weekly Mon crons, promotion_gate: LOOP-WP-0005-T07). Not promoted.
activity-core handoff
id: LOOP-WP-0005-T06
status: done
priority: medium
state_hub_task_id: "92f93ac2-8d01-4094-b701-aa991e4b4caf"
Completed 2026-06-18: state-hub handoff R2 posted to activity-core
(bffa224c-3594-4fc9-9fa6-a2fc528bbda3, task 25293d5e-49d6-4c18-af53-317a8c86edcb).
Spec covers shell resolver contract, gap shape, round-robin batching, and acceptance
criteria for coulomb-daily-registry-hygiene-sweep.
Regulator review (gate)
id: LOOP-WP-0005-T07
status: done
priority: low
state_hub_task_id: "890416df-45db-437c-ba9a-355ac464ad0e"
Completed 2026-06-19: operator override per ADR-003 (day 2/14). Regulator session
evidence reviewed; all loops promoted to operate weekly. DEC-008 filed;
loops/*/cadence.yml updated; activity definitions renamed coulomb-daily-* →
coulomb-weekly-*. activity-core sync pending.
Definition of done
- Dashboard and SCOPE reflect stabilize reality
- Observation window documented with review date
- reuse-surface expansion path defined
- Weekly promotion decision (DEC-008, operator override)