generated from coulomb/repo-seed
83 lines
2.1 KiB
Markdown
83 lines
2.1 KiB
Markdown
---
|
|
id: IB-WP-0004
|
|
type: workplan
|
|
title: "Reference Infospace Pilot"
|
|
domain: markitect
|
|
repo: infospace-bench
|
|
status: done
|
|
owner: markitect
|
|
topic_slug: markitect
|
|
created: "2026-05-03"
|
|
updated: "2026-05-14"
|
|
state_hub_workstream_slug: "ib-wp-0004-reference-infospace-pilot"
|
|
state_hub_workstream_id: "8940a180-646a-4b20-b41f-c56719adfb0e"
|
|
---
|
|
|
|
# IB-WP-0004 — Reference Infospace Pilot
|
|
|
|
## Goal
|
|
|
|
Create the first maintained reference infospace in this repo. The large
|
|
`markitect-main/examples/infospace-with-history/` corpus remains the primary
|
|
future migration candidate; this workplan starts with a small purpose-built
|
|
bootstrap corpus so baseline behavior is easy to inspect.
|
|
|
|
## Tasks
|
|
|
|
### T01 — Decide pilot corpus scope
|
|
|
|
```task
|
|
id: IB-WP-0004-T01
|
|
status: done
|
|
priority: high
|
|
state_hub_task_id: "5042482f-a14c-4ae5-8d1a-19039dc97010"
|
|
```
|
|
|
|
- Choose between a small purpose-built corpus and a pruned Wealth of
|
|
Nations/VSM corpus
|
|
- Record the decision in `docs/`
|
|
|
|
### T02 — Migrate configuration and methodology
|
|
|
|
```task
|
|
id: IB-WP-0004-T02
|
|
status: done
|
|
priority: high
|
|
state_hub_task_id: "a0909309-775b-4220-94f5-6ca811d44caf"
|
|
```
|
|
|
|
- Adapt `infospace.yaml`
|
|
- Bring over metrics methodology and tutorial material where still valid
|
|
- Remove generated output bulk unless needed as fixtures
|
|
|
|
### T03 — Define source provenance and artifact policy
|
|
|
|
```task
|
|
id: IB-WP-0004-T03
|
|
status: done
|
|
priority: medium
|
|
state_hub_task_id: "10c001a3-ce42-4f1b-8b9a-9965844a94cb"
|
|
```
|
|
|
|
- Record source origin, license/public-domain status where applicable, and
|
|
transformation history expectations
|
|
- Decide which generated outputs are committed versus regenerated
|
|
|
|
### T04 — Run first baseline evaluation
|
|
|
|
```task
|
|
id: IB-WP-0004-T04
|
|
status: done
|
|
priority: medium
|
|
state_hub_task_id: "b5e43c2a-b29c-4cb6-b33c-b4db631d0079"
|
|
```
|
|
|
|
- Execute lifecycle and evaluation baseline from IB-WP-0002 and IB-WP-0003
|
|
- Save reports under the pilot infospace output structure
|
|
|
|
## Acceptance
|
|
|
|
- A concrete infospace exists in `infospaces/`
|
|
- The pilot demonstrates lifecycle, evaluation, and inspection behavior
|
|
- Migration from `markitect-main` is traceable and intentionally scoped
|