7f9a8dd441
feat(P3): IHF Phase 3 complete — Governance and Decision Linkage
...
Implements the full governance layer:
- Schema: requirements, decision_records, policy_references,
implementation_change_references; requirement_candidates gets
requirement_id back-reference
- RequirementsController (index/show; promotion-only create)
- DecisionRecordsController (CRUD + policy/impl ref management)
- GovernanceDashboardAction on HubsController (AutoRefresh)
- PromoteToRequirementAction + LinkToDecisionAction on candidates
- Outcome immutability enforced at controller level (fill excludes outcome)
- Full six-outcome vocabulary with Tailwind color roles
- Integration tests for all Phase 3 paths
- FrontController: registers Phase 2 missing controllers + all Phase 3
- SCOPE.md + docs/phase3-summary.md updated
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com >
2026-03-29 10:42:56 +00:00
840b0e5c7b
feat(P2+P3): IHF Phase 2 complete; register Phase 3 workplan
...
Phase 2 — Structured Feedback and Triage (IHUB-WP-0002):
- Schema: annotation_threads, requirement_candidates, triage_states,
reviewer_assignments; annotations extended with severity + thread_id
- AnnotationThreadsController: create threads, assign annotations
- RequirementCandidatesController: CRUD, escalation, triage lifecycle,
reviewer assignment, my-queue
- Annotation severity (low/medium/high/critical) with Tailwind color cues
- TriageDashboardAction on HubsController with autoRefresh
- Integration tests (T01–T09), SCOPE.md updated, docs/phase2-summary.md
Phase 3 — Governance and Decision Linkage (IHUB-WP-0003):
- Workplan registered: 9 tasks, State Hub workstream 5f201ee3
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com >
2026-03-29 10:42:56 +00:00
54bf0d9357
feat(T12): Phase 1 gate — docs, SCOPE update, all tasks done
...
Test / test (push) Has been cancelled
- docs/phase1-summary.md: what was built, known limitations, Phase 2 readiness
- SCOPE.md: current state updated to Phase 1 complete
- All 12 workplan tasks marked done; workplan status set to done
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com >
2026-03-27 01:45:05 +00:00
8b6ce5bbc8
docs: add specification, reference docs, workplan, and agent guidance
...
Adds all Phase 0 content that was created but never committed:
- CLAUDE.md and SCOPE.md — agent and developer orientation
- specs/TailwindForInteractionHubs_v0.2.md — IHF Tailwind coding guide
- docs/ — five IHP v1.5 reference guides (overview, data, controllers, realtime, ihf-mapping)
- workplans/IHUB-WP-0001 — Phase 1 implementation plan (12 tasks, state-hub synced)
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com >
2026-03-27 02:07:13 +01:00