Commit Graph

13 Commits

Author SHA1 Message Date
cfcf4c81f7 chore(consistency): add IHUB-WP-0002 workplan file and fix repo path
Some checks failed
Test / test (push) Has been cancelled
Creates the missing Phase 2 workplan file to resolve C-07 ADR-001
violation (active DB workstream with no backing file). Also corrects
the registered repo path from /home/tegwick to /home/worsch on
host bnt-lap001. Consistency check now PASS (0 fail, 0 warn).

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-28 23:03:06 +01:00
af9c3c1d21 chore(consistency): sync task status from DB [auto]
Updated by fix-consistency on 2026-03-27:
  - update .custodian-brief.md for inter-hub
2026-03-28 23:02:25 +01:00
87049dfc1f chore: register Phase 2 workplan (IHUB-WP-0002)
Some checks failed
Test / test (push) Has been cancelled
IHF Phase 2 — Structured Feedback and Triage. 9 tasks (T01–T09)
covering AnnotationThread, RequirementCandidate, TriageState,
ReviewerAssignment, escalation action, and triage dashboard.
Workstream registered in State Hub under inter_hub topic.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-28 01:00:03 +00:00
2031a93f2e chore: claim workplan under inter_hub domain
Some checks failed
Test / test (push) Has been cancelled
Register inter-hub in the State Hub as its own domain (inter_hub),
update repo host path, wire domain goal / repo goal / workstream.
Workplan domain corrected from custodian → inter_hub.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-28 00:41:57 +00:00
9aaccd6a27 chore(consistency): sync task status from DB [auto]
Some checks failed
Test / test (push) Has been cancelled
Updated by fix-consistency on 2026-03-27:
  - update .custodian-brief.md for inter-hub
2026-03-27 14:08:39 +01:00
54bf0d9357 feat(T12): Phase 1 gate — docs, SCOPE update, all tasks done
Some checks failed
Test / test (push) Has been cancelled
- docs/phase1-summary.md: what was built, known limitations, Phase 2 readiness
- SCOPE.md: current state updated to Phase 1 complete
- All 12 workplan tasks marked done; workplan status set to done

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-27 01:45:05 +00:00
c560e541c7 feat(T02-T11): IHF Phase 1 schema, controllers, views, and helpers
- Schema: hubs, widgets, widget_versions, interaction_events (append-only
  trigger), annotations, users — single migration file
- Web layer: Types, Routes, FrontController with auth + AutoRefresh layout
- Controllers: Hubs (CRUD), Widgets (CRUD + versioning), InteractionEvents
  (JSON capture, canonical event_type validation), Annotations (threaded,
  append-only)
- Sessions controller for IHP auth
- Views: Hubs (index/show/new/edit), Widgets (index/show/new/edit),
  Annotations (index/new), Sessions (login)
- widgetEnvelope helper with full data-* governance attributes
- Integration tests: Hub CRUD, Widget versioning, event capture, append-only
  guard, annotation threading, validation

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-27 01:42:43 +00:00
ff11913d5c feat(T01): bootstrap IHP v1.5 project scaffold
Merged ihp-new generated scaffold into repo. Sets appName to inter-hub,
adds Nix flake with IHP inputs, devenv config, and standard IHP project
structure. Nix + ihp-new + direnv installed system-wide.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-27 01:36:18 +00:00
8b6ce5bbc8 docs: add specification, reference docs, workplan, and agent guidance
Adds all Phase 0 content that was created but never committed:
- CLAUDE.md and SCOPE.md — agent and developer orientation
- specs/TailwindForInteractionHubs_v0.2.md — IHF Tailwind coding guide
- docs/ — five IHP v1.5 reference guides (overview, data, controllers, realtime, ihf-mapping)
- workplans/IHUB-WP-0001 — Phase 1 implementation plan (12 tasks, state-hub synced)

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-27 02:07:13 +01:00
75b88ee760 chore(consistency): sync task status from DB [auto]
Updated by fix-consistency on 2026-03-27:
  - update .custodian-brief.md for inter-hub
2026-03-27 01:29:09 +01:00
6583fdad7e chore(consistency): sync task status from DB [auto]
Updated by fix-consistency on 2026-03-27:
  - update .custodian-brief.md for inter-hub
2026-03-27 01:15:49 +01:00
f29c467abf Added specification 2026-03-27 00:47:04 +01:00
Coulomb Social
4bfa43568d Initial commit 2026-03-26 23:43:55 +00:00