9e8d73fa7d docs(roadmap): close out infospace tooling S3 and parent roadmap
All three stages of the infospace tooling roadmap are complete. The Wealth
of Nations / VSM example passes 6/6 viability thresholds on 988 entities,
and composition is demonstrated via the supply-chain-vsm example.

- Parent roadmap (roadmap/infospace-tooling/PLAN.md): header now shows the
  closed status with final validation metrics.
- S3 close-out plan (roadmap/infospace-s3-closeout/PLAN.md): records the
  final task dispositions. C.1–C.6 and C.8 done; C.7 (clean per-chapter
  git history) is deferred indefinitely — the task was cosmetic, its
  prerequisite branch no longer exists, and reconstructing 35 archival
  commits would not change any output files. Rationale documented inline.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-04-22 07:08:43 +02:00
b5e994b014 docs: preliminary introduction to Viable Information Spaces
Conceptual overview of infospaces as structured, evaluable, composable
knowledge collections. Establishes the vocabulary (topic, discipline,
entity, viability), the build cycle (extract, map, evaluate, refine),
the five collection quality concerns, and the composition model
(hierarchical, networked, swarm).

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-18 23:54:53 +01:00
4ce856d4d0 docs: metrics methodology, collection-level tasks, and infospace tooling roadmap
Add METRICS-METHODOLOGY.md documenting the theoretical frameworks
(SEQUAL, OntoClean, OOPS!, OntoQA, FCA, DSL principles) adapted for
two-layer evaluation (LLM-Eval + deterministic aggregation) across
five collection concerns: redundancy, coverage, coherence, consistency,
and granularity balance.

Extend INFRA-TASKS.md with assignment assessment (tasks 4-7),
per-concept metrics (tasks 8-12), and collection-level metrics
(tasks 13-19).

Add roadmap/infospace-tooling/PLAN.md defining terminology (infospace,
topic, discipline, entity, evaluation, viability) and a three-stage
implementation plan: Stage 1 platform additions, Stage 2 infospace
tooling layer, Stage 3 example revision.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>