Batch classification via OpenRouter (claude-sonnet-4). 165 entities
remain unclassified due to credit exhaustion; incremental skip means
a follow-up run will complete them automatically.
Type × VSM matrix (823 entities):
S1 S2 S3 S3* S4 S5
Element 86 75 58 21 43 32 (315 total, 38%)
Process 39 42 37 17 67 24 (226 total, 28%)
Institution 4 12 30 24 . 52 (122 total, 15%)
Principle 3 7 15 2 43 32 (102 total, 12%)
Relation 2 14 5 5 22 10 (58 total, 7%)
Matrix fill: 29/30 cells (Institution/S4 empty — expected)
Metrics updated: type_entropy=2.0936, vsm_type_matrix_cells=29
Also:
- BatchEvaluator gains delay_seconds param for rate-limited providers
- classify CLI gains --rpm option (--rpm 10 for Gemini free tier)
- history.write_metrics_file now handles non-float metric values
(type_distribution is a dict, was crashing round())
- run_entity_classification forwards delay_seconds to BatchEvaluator
- classify-links and graph commands added by user (entities --by-type,
graph --format mermaid/dot, classify-links for Relation enrichment)
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
31 lines
974 B
Markdown
31 lines
974 B
Markdown
---
|
|
entity_slug: declining_manufacture
|
|
entity_type: Process
|
|
vsm_system: S1
|
|
type_rationale: '"Declining Manufacture" describes an ongoing transformation or deterioration
|
|
of manufacturing activity over time, representing a flow or change process rather
|
|
than a static entity.'
|
|
vsm_rationale: This process directly concerns the reduction of primary productive
|
|
manufacturing activities, which are the core operational functions of S1 in the
|
|
VSM framework.
|
|
classified_at: '2026-02-23T10:57:40.399756'
|
|
---
|
|
|
|
# Classification: Declining Manufacture
|
|
|
|
## Entity Type
|
|
|
|
Process
|
|
|
|
## VSM System
|
|
|
|
S1
|
|
|
|
## Type Rationale
|
|
|
|
"Declining Manufacture" describes an ongoing transformation or deterioration of manufacturing activity over time, representing a flow or change process rather than a static entity.
|
|
|
|
## VSM Rationale
|
|
|
|
This process directly concerns the reduction of primary productive manufacturing activities, which are the core operational functions of S1 in the VSM framework.
|