Commit Graph

6 Commits

Author SHA1 Message Date
6e05946163 docs(NET-WP-0018): add explicit guidance in Coordination Notes on using pragmatic auditing/tracking infra (State Hub progress/decisions, workplan dated notes, git, console evidence/metadata, local audit) during 0018 implementation to feed T03 retrospective + optimization review
- References existing audit_core bootstrap risk acceptance (production sink deferred)
- Cross-refs T03 gap matrix (includes audit), T02 (document current pragmatic audit paths), assessment gap 7 (correlation), local-identity/audit.py, contract requirements
- Answers query: pragmatic is sufficient and intended for tracking the workplan work + retrospect; do not block on establishing full production Audit Core first (risk accepted for bootstrap phase)
- Per session protocol + ADR-001 (file first)
2026-06-03 16:17:46 +02:00
000d263bea review(NET-WP-0018): update frontmatter, add Related section, and dated notes (2026-06-03) across T02-T09 for 0019 polish artifacts + user-engine/net-kingdom assessment
- T04: assessment fulfills UE boundary/intent/scope review (7 gaps detailed)
- T02/T03/T05/T06/T08/T09: note post-0017/0019 state, enablers (orchestrator, console subcmds, make targets, claims helper, evidence/validators, runbook exposure), remaining work, cross-refs to assessment
- T07 note enhanced with pointer to 0019 impl
- T01 note trimmed to pointer
- updated date + Related section
- Prepares for impl readiness assessment; no status changes (still 1/9 in file/hub pending tasks)

See docs/user-engine-netkingdom-integration-assessment.md and NET-WP-0019.
2026-06-03 11:47:41 +02:00
1721226427 docs: persist user-engine vs net-kingdom integration assessment (new doc + cross-references in SCOPE, boundary contract, guidance, responsibility map, 0018/0019 workplans). Also updated user-engine integration doc to reference it. 2026-06-03 10:33:31 +02:00
92bf7d1d1c NET-WP-0019: implement T05 (OIDC claims helper + integration in script/console) and T06 (add dry-run to runbook_payloads for web-ui exposure; cross-link update in 0018 T07). Update workplan notes. 2026-06-03 07:10:56 +02:00
9a8ec0d9a5 Finish NET-WP-0015 bootstrap handoff 2026-06-01 21:55:30 +02:00
8382a11e8e Add bootstrap rebuild readiness workplan 2026-06-01 21:48:48 +02:00