generated from coulomb/repo-seed
Some checks failed
ci / validate-registry (push) Has been cancelled
Mark coverage campaign finished with 62/62 roster coverage and 61 production federated capabilities; update SCOPE.md current state and add completion milestone history.
35 lines
1.3 KiB
Markdown
35 lines
1.3 KiB
Markdown
# REUSE-WP-0017 coverage campaign — complete
|
|
|
|
**Date:** 2026-07-07
|
|
**Workplan:** `workplans/REUSE-WP-0017-capability-coverage-campaign.md`
|
|
|
|
## Outcome
|
|
|
|
The workstation capability registry coverage campaign is **finished**.
|
|
|
|
| Metric | Result |
|
|
| --- | --- |
|
|
| Roster repos | **62/62** established |
|
|
| Capability coverage | **62/62** (`has` or explicit `no-capability`) |
|
|
| Unclassified scaffolds | **0** |
|
|
| Publish pass | **62/62** |
|
|
| Production federated capabilities | **61** (61 enabled hub sources) |
|
|
| Local `federated.yaml` | **61** capabilities (matches production) |
|
|
|
|
## Key events (2026-07-07)
|
|
|
|
- `core-hub` added to roster and hub-registered (Forgejo URL)
|
|
- `inter-hub` retired — capability `deprecated`, hub registration **disabled**
|
|
- Eight Forgejo-migrated repos got hub URL fixes (were still on stale Gitea raw URLs)
|
|
- Production `POST /v1/federated/compose` refreshed index from 26 → **61** capabilities
|
|
- T05 human review approved; follow-up registry commits in `vergabe-teilnahme`,
|
|
`markitect-main`, `issue-core`, `core-hub`
|
|
|
|
## Acceptance
|
|
|
|
All REUSE-WP-0017 acceptance criteria met (see workplan frontmatter).
|
|
|
|
## Follow-on
|
|
|
|
- **REUSE-WP-0018** — plan-check consumption loop (unblocked by published federated index)
|
|
- **REUSE-WP-0019** — Gitea→Forgejo host migration for remaining ~53 hub registrations |