Files
the-custodian/docs/fos-hub-bootstrap-sequence-status.md

35 lines
2.9 KiB
Markdown

# FOS Hub Bootstrap Sequence Status
Updated: 2026-06-27
## Purpose
Track `CUST-WP-0051-T07` and `CUST-WP-0052`: sequence `CUST-WP-0025` so FOS Hub bootstrap can resume from current repo reality rather than the older mega-hub/Keycloak/Inter-Hub assumptions.
## Current Decision
Do not restart FOS bootstrap at the old `NK-WP-0001` Keycloak path. That workplan is archived and superseded. The active identity baseline is:
- `NK-WP-0002` local identity: complete; usable for bootstrap/dev OIDC.
- `NK-WP-0012` IAM Profile v0.2: finished; canonical NetKingdom-owned profile and conformance suite.
- KeyCape/Authelia/LLDAP stack from the superseding NetKingdom path: current lightweight identity mode.
- `NK-WP-0011` expanded-mode Keycloak: proposed enterprise federation lane, not a blocker for ops-hub bootstrap.
## Sequence Board
| Area | Current state | Pickup action |
| --- | --- | --- |
| Identity | Old `CUST-WP-0025-T01` pointed at archived `NK-WP-0001`; local identity and IAM Profile v0.2 are done. | Keep T01 cancelled, T02 done, and make T03 the remaining identity gate: a protected FastAPI fixture using IAM Profile v0.2 against local-identity or KeyCape. |
| Hub extraction/dev-hub | `CUST-WP-0025-T05` through `T12` are done: hub-core exists, State Hub imports hub-core, and MCP naming moved to dev-hub. | Treat Phase 2 as complete. Do not spend pickup energy here unless consistency drift appears. |
| Ops hub | Core Hub is now the replacement platform: `CORE-WP-0008` finished the API smoke harness, activity-core sink, staging profile, CLI wrappers, UI rebuild backlog, and Custodian handoff. Live deployed smokes and cutover evidence are still open. | Continue through Core Hub deployed evidence, migration import, activity-core smoke, and cutover gates. Treat Haskell Inter-Hub as legacy compatibility or rollback evidence. |
| Old ops-hub scaffold tasks | `CUST-WP-0025-T13`-`T19` have been rewritten around Core Hub API evidence, CLI parity, deployed smoke/cutover gates, whynot-aligned UI, and cancellation of immediate standalone ops-hub MCP registration. | Execute the remaining wait/todo gates in the rewritten Phase 3. Do not resume the obsolete standalone ops-hub scaffold sequence. |
| Fin hub/business | `CUST-WP-0025-T20`-`T26` are all todo and depend on a proven multi-hub pattern. | Defer until ops-hub has a working first signal and the identity integration gate is proven. |
## Stable Pickup Order
1. Close the identity drift: T01 cancelled, T02 done, T03 remains as the one real identity integration test.
2. Use the finished `CORE-WP-0008` evidence lane and `CUST-WP-0052` reset notes as the Core Hub replacement baseline.
3. Keep `CUST-WP-0047`/`CUST-WP-0049` as legacy evidence/fallback until Core Hub deployed smoke evidence or an explicit supersede decision closes them.
4. Execute rewritten `CUST-WP-0025-T14`, `T16`, `T17`, and `T18` in API/CLI/UI order.
5. Start fin-hub/business work only after ops-hub proves the Core Hub pattern end-to-end.