Files
whynot-control/WORKPLAN.md
2026-05-23 03:39:47 +02:00

2.1 KiB
Raw Permalink Blame History

Workplan

Goal

Establish whynot-control as the control repository for prototype exploration, market-signal capture, and early validation.

Phase 0 — Create the Repository

Objective

Create the initial repo structure and seed the core documents.

Tasks

  • Create whynot-control in the whynot Gitea organization.
  • Add core documents.
  • Create inbox/, prototypes/, signals/, betas/, offers/, templates/, and agent-tasks/.

Done When

The repository exists and provides a first usable control surface for prototype exploration.

Phase 1 — Establish Intake

Create a reliable way to capture and triage ideas.

Tasks:

  • Define intake rules.
  • Add the prototype card template.
  • Add the signal record template.
  • Add the experiment record template.
  • Add the beta plan template.
  • Define when an idea becomes a prototype candidate.

Phase 2 — Seed Initial Prototype Candidates

Create the first small set of prototype cards.

Tasks:

  • Identify 37 candidate ideas.
  • Write a prototype card for each.
  • Assign lifecycle stage.
  • Assign likely promotion target.
  • Define smallest useful test.

Phase 3 — Define Signal Capture

Make feedback and market signal visible.

Tasks:

  • Define signal strength scale.
  • Create first signal records.
  • Connect signals to prototype cards.
  • Identify weak vs strong evidence.

Phase 4 — Prepare Closed Beta Model

Create a controlled path for early users and feedback.

Tasks:

  • Define beta types.
  • Define beta entry criteria.
  • Define beta exit outcomes.
  • Create a first beta plan template.

Phase 5 — Define Promotion Criteria

Prevent premature productization while enabling strong ideas to move forward.

Tasks:

  • Define promotion criteria for Helix.
  • Define promotion criteria for Coulomb.
  • Define promotion criteria for Sloppers.
  • Define promotion criteria for Plenitude.
  • Define when Binky must be involved.

Phase 6 — Connect to Tegwick Landscape

Ensure whynot remains aligned with the broader project landscape.

Tasks:

  • Add a reference from tegwick-control.
  • Confirm activation level.
  • Document dependencies.
  • Create initial review rhythm.