Core Hub Cutover Decision Coupling
Date: 2026-07-08
Related workplans: CUST-WP-0025-T17, CORE-WP-0005, CORE-WP-0007,
CUST-WP-0047, CUST-WP-0049.
Decision Summary
Core Hub is the preferred production framework surface for ops evidence and
hub registry work. Haskell Inter-Hub remains available as rollback-only
fallback through the stabilization window and until CORE-WP-0007 operator
sign-off retires it.
| Question | Decision |
|---|---|
| Is legacy Inter-Hub still required for normal operation? | No — production ingress at hub.coulomb.social serves Core Hub since 2026-07-03. |
| Is Inter-Hub fallback still required? | Yes, rollback-only until stabilization closes and CORE-WP-0007-T02 is approved. |
| Are the three cutover gates satisfied? | Yes — deployed API smoke, staging import, and activity-core sink evidence all pass. |
| Can Phase 4 fin-hub work begin? | Yes — multi-hub pattern is proven at Level 2→3 boundary; fin models remain separate implementation. |
Readiness Gates
Evidence stubs live under docs/evidence/ and aggregate through Core Hub
readiness-summary:
cd /home/worsch/core-hub
make operator-cli CLI_ARGS="readiness-summary \
--deployed-smoke-report /home/worsch/the-custodian/docs/evidence/core-hub-deployed-smoke-20260702235645.json \
--migration-report /home/worsch/the-custodian/docs/evidence/core-hub-migration-import-20260703.json \
--activity-core-report /home/worsch/the-custodian/docs/evidence/core-hub-activity-core-sink-20260702.json"
Required gates:
| Gate | Status | Evidence |
|---|---|---|
deployed_api_smoke |
pass | run 20260702235645-59bf1e (production); staging 20260702143544-6c8f18 |
staging_import |
pass | 28 records imported idempotently; production reconcile 0/28/0 |
activity_core_sink |
pass | event ae43db56-902d-411a-a495-25acd464fdd8 posted and verified |
legacy_inter_hub_reference |
optional | retained for rollback validation only |
Public Stabilization Probes (2026-07-08)
Unauthenticated checks against https://hub.coulomb.social:
| Endpoint | Expected | Observed |
|---|---|---|
/healthz |
200 | 200 (service: core-hub) |
/readyz |
200 | 200 (configuration, database_url, api_auth ok) |
/api/v2/widget-types |
200 | 200 |
/api/v2/hubs |
401 | 401 (hardened contract) |
Consumer Compatibility Notes
Consumers migrating from Inter-Hub /api/v2 must account for:
- Auth hardening —
/api/v2/hubsis protected on Core Hub. Anonymous listing consumers must obtain a token. Audit found no production dependency on anonymous 200 responses. - Catalog shape — Core Hub catalogs use
{name, slug, description}; Inter-Hub used{name, label, description, ownerHubId, status}. Parsers must acceptslugas the stable identifier. - Health endpoints — Core Hub adds
/healthzand/readyz; Inter-Hub returned 404 on these paths. - Ops vocabulary — all 7 orphaned
ops-*widget types and matching event types are seeded in Core Hub before cutover; migrated widgets are referentially complete.
Rollback and Haskell Retirement Gates
Rollback remains one ingress flip:
- Delete Core Hub ingress (
30-ingress.yaml) - Apply
rollback-inter-hub-ingress.yaml - Inter-Hub deployment stays running untouched through stabilization
CORE-WP-0007 Haskell retirement requires:
- stabilization window close (through 2026-07-10T17:35Z per workplan)
- operator approval after repeated public probe pass
- explicit decision that rollback is no longer operationally required
Supersede Decisions
| Legacy task | Superseded by | Date |
|---|---|---|
CUST-WP-0047-T05 Inter-Hub widget activation |
Core Hub production cutover + deployed smoke | 2026-07-03 |
CUST-WP-0049-T06 Inter-Hub bootstrap access lane |
Core Hub operator CLI + deployed evidence | 2026-07-03 |
Do not request new Inter-Hub operator keys for the preferred replacement lane.
Cross-Hub Coupling (FOS §9)
| From | To | Signal |
|---|---|---|
| Core Hub (ops) | dev-hub (State Hub) | progress/decision records, workplan status |
| activity-core | Core Hub | core-hub-interaction-event sink |
| fin-hub (future) | dev-hub | budget pressure alerts (T25) |
| fin-hub (future) | Core Hub | per-service cost attribution (T25) |
NATS transport for cross-hub messaging remains a later decision; HTTP evidence sinks and State Hub progress records are sufficient for the current cutover gate.