# Core Hub Cutover Decision Coupling
|
|
|
|
Date: 2026-07-08
|
|
|
|
Related workplans: `CUST-WP-0025-T17`, `CORE-WP-0005`, `CORE-WP-0007`,
|
|
`CUST-WP-0047`, `CUST-WP-0049`.
|
|
|
|
## Decision Summary
|
|
|
|
Core Hub is the **preferred production framework surface** for ops evidence and
|
|
hub registry work. Haskell Inter-Hub remains available as **rollback-only**
|
|
fallback through the stabilization window and until `CORE-WP-0007` operator
|
|
sign-off retires it.
|
|
|
|
| Question | Decision |
|
|
| --- | --- |
|
|
| Is legacy Inter-Hub still required for normal operation? | **No** — production ingress at `hub.coulomb.social` serves Core Hub since 2026-07-03. |
|
|
| Is Inter-Hub fallback still required? | **Yes, rollback-only** until stabilization closes and `CORE-WP-0007-T02` is approved. |
|
|
| Are the three cutover gates satisfied? | **Yes** — deployed API smoke, staging import, and activity-core sink evidence all pass. |
|
|
| Can Phase 4 fin-hub work begin? | **Yes** — multi-hub pattern is proven at Level 2→3 boundary; fin models remain separate implementation. |
|
|
|
|
## Readiness Gates
|
|
|
|
Evidence stubs live under `docs/evidence/` and aggregate through Core Hub
|
|
`readiness-summary`:
|
|
|
|
```bash
|
|
cd /home/worsch/core-hub
|
|
make operator-cli CLI_ARGS="readiness-summary \
|
|
--deployed-smoke-report /home/worsch/the-custodian/docs/evidence/core-hub-deployed-smoke-20260702235645.json \
|
|
--migration-report /home/worsch/the-custodian/docs/evidence/core-hub-migration-import-20260703.json \
|
|
--activity-core-report /home/worsch/the-custodian/docs/evidence/core-hub-activity-core-sink-20260702.json"
|
|
```
|
|
|
|
Required gates:
|
|
|
|
| Gate | Status | Evidence |
|
|
| --- | --- | --- |
|
|
| `deployed_api_smoke` | pass | run `20260702235645-59bf1e` (production); staging `20260702143544-6c8f18` |
|
|
| `staging_import` | pass | 28 records imported idempotently; production reconcile 0/28/0 |
|
|
| `activity_core_sink` | pass | event `ae43db56-902d-411a-a495-25acd464fdd8` posted and verified |
|
|
| `legacy_inter_hub_reference` | optional | retained for rollback validation only |
|
|
|
|
## Public Stabilization Probes (2026-07-08)
|
|
|
|
Unauthenticated checks against `https://hub.coulomb.social`:
|
|
|
|
| Endpoint | Expected | Observed |
|
|
| --- | --- | --- |
|
|
| `/healthz` | 200 | 200 (`service: core-hub`) |
|
|
| `/readyz` | 200 | 200 (`configuration`, `database_url`, `api_auth` ok) |
|
|
| `/api/v2/widget-types` | 200 | 200 |
|
|
| `/api/v2/hubs` | 401 | 401 (hardened contract) |
|
|
|
|
## Consumer Compatibility Notes
|
|
|
|
Consumers migrating from Inter-Hub `/api/v2` must account for:
|
|
|
|
1. **Auth hardening** — `/api/v2/hubs` is protected on Core Hub. Anonymous
|
|
listing consumers must obtain a token. Audit found no production dependency
|
|
on anonymous 200 responses.
|
|
2. **Catalog shape** — Core Hub catalogs use `{name, slug, description}`; Inter-Hub
|
|
used `{name, label, description, ownerHubId, status}`. Parsers must accept
|
|
`slug` as the stable identifier.
|
|
3. **Health endpoints** — Core Hub adds `/healthz` and `/readyz`; Inter-Hub
|
|
returned 404 on these paths.
|
|
4. **Ops vocabulary** — all 7 orphaned `ops-*` widget types and matching event
|
|
types are seeded in Core Hub before cutover; migrated widgets are referentially
|
|
complete.
|
|
|
|
## Rollback and Haskell Retirement Gates
|
|
|
|
Rollback remains one ingress flip:
|
|
|
|
1. Delete Core Hub ingress (`30-ingress.yaml`)
|
|
2. Apply `rollback-inter-hub-ingress.yaml`
|
|
3. Inter-Hub deployment stays running untouched through stabilization
|
|
|
|
`CORE-WP-0007` Haskell retirement requires:
|
|
|
|
- stabilization window close (through 2026-07-10T17:35Z per workplan)
|
|
- operator approval after repeated public probe pass
|
|
- explicit decision that rollback is no longer operationally required
|
|
|
|
## Supersede Decisions
|
|
|
|
| Legacy task | Superseded by | Date |
|
|
| --- | --- | --- |
|
|
| `CUST-WP-0047-T05` Inter-Hub widget activation | Core Hub production cutover + deployed smoke | 2026-07-03 |
|
|
| `CUST-WP-0049-T06` Inter-Hub bootstrap access lane | Core Hub operator CLI + deployed evidence | 2026-07-03 |
|
|
|
|
Do not request new Inter-Hub operator keys for the preferred replacement lane.
|
|
|
|
## Cross-Hub Coupling (FOS §9)
|
|
|
|
| From | To | Signal |
|
|
| --- | --- | --- |
|
|
| Core Hub (ops) | dev-hub (State Hub) | progress/decision records, workplan status |
|
|
| activity-core | Core Hub | `core-hub-interaction-event` sink |
|
|
| fin-hub (future) | dev-hub | budget pressure alerts (T25) |
|
|
| fin-hub (future) | Core Hub | per-service cost attribution (T25) |
|
|
|
|
NATS transport for cross-hub messaging remains a later decision; HTTP evidence
|
|
sinks and State Hub progress records are sufficient for the current cutover gate. |